首页|期刊导航|太阳能|光伏组件版型对光伏发电系统BOS成本的影响研究

光伏组件版型对光伏发电系统BOS成本的影响研究OA

RESEARCH ON IMPACT OF PV MODULE FORMAT ON BOS COST OF PV POWER GENERATION SYSTEM

中文摘要英文摘要

系统平衡(BOS)成本是光伏发电项目是否实施的决定性因素.以沙特阿拉伯利雅得地区某光伏发电项目为研究背景,探讨光伏组件版型对光伏发电系统BOS 成本的影响.首先介绍了光伏发电系统BOS成本的影响因素;然后遵循单一变量原则,以 G12R-66 和 G12-66 这 2 种版型的光伏组件(下文分别简称为"G12R组件"和"G12 组件")为例,详细分析了光伏组件版型对光伏组件运输单瓦成本、光伏阵列安装单瓦成本、直流电缆单瓦成本、光伏支架单瓦成本等可变BOS 成本的影响,并对不同光伏支架方案下采用不同版型光伏组件时的BOS单瓦成本进行了详细计算和对比分析.研究结果表明:1)运输时,光伏组件的集装箱利用率越高,其运输单瓦成本的优势越明显;单块光伏组件的峰值功率越高、尺寸越大,光伏组件现场搬运和安装、光伏支架安装越具有议价优势;光电转换效率相同情况下,光伏组件的尺寸越大,直流电缆用量越少.2)特定设计条件下,在固定式光伏支架方案与多电机驱动平单轴跟踪式光伏支架方案中,2 种版型光伏组件的光伏支架单瓦成本接近,而G12 组件的直流电缆用量更少、光伏阵列安装单瓦成本更低,因此其BOS 单瓦成本更具优势.3)特定设计条件下,在单电机驱动平单轴跟踪式光伏支架方案中,由于G12组件的光伏支架利用率较低,导致其 BOS 单瓦成本处于劣势;增加光伏支架极限长度使 2 种版型光伏组件的光伏支架利用率基本相同后,二者的BOS单瓦成本基本一致,G12组件具有略微优势.

The BOS cost is a decisive factor in whether a PV power generation project will be implemented.This paper takes a PV power generation project in Riyadh,Saudi Arabia as the research background,and explores the impact of PV module format on the BOS cost of PV power generation systems.First,the influencing factors of BOS costs in PV power generation systems are introduced.Then,following the principle of single variable,taking the two PV module formats G12R-66 and G12-66(hereinafter referred to as"G12R modules"and"G12 modules"respectively)as examples to analyze in detail how PV module formats affect variable BOS costs such as the transportation cost per watt of PV modules,the installation cost per watt of PV arrays,the DC cable cost per watt,and the PV bracket cost per watt.Additionally,the BOS cost per watt under different PV bracket schemes with varying PV module formats is calculated and compared in detail.The research result show that:1)During transportation,the higher the container utilization rate of PV modules,the more pronounced the advantage of transportation cost per watt.The higher the peak power and larger the size of a single PV module,the more bargaining advantage it is for on-site handling and installation of PV modules,as well as installation of PV brackets.Under the same photoelectric conversion efficiency,the larger the PV module size,the less DC cable is used.2)Under specific design conditions,in the fixed PV bracket scheme and the multi motor driven flat single axis tracking PV bracket scheme,the PV bracket cost per watt of two PV module formats is similar,while the G12 module has less DC cable usage and lower PV array installation cost per watt,so its BOS cost per watt is more advantageous.3)Under specific design conditions,in the single motor driven flat single axis tracking PV bracket scheme,due to the low PV bracket utilization rate of the G12 module,its BOS cost per watt is at a disadvantage.After increasing the PV bracket maximum length to make the PV bracket utilization rate of two PV module formats basically the same,the BOS cost per watt of the two is basically the same,and the G12 module has a slight advantage.

唐聪;向陈;樊华龙;慎小宝;王思平;邢国强

通威太阳能(成都)有限公司,成都 610299通威太阳能(成都)有限公司,成都 610299通威太阳能(成都)有限公司,成都 610299通威太阳能(成都)有限公司,成都 610299通威太阳能(成都)有限公司,成都 610299通威太阳能(成都)有限公司,成都 610299

信息技术与安全科学

光伏组件版型光伏发电系统系统平衡成本光伏支架直流电缆运输成本安装成本

PV module formatPV power generation systemBOS costPV bracketsDC cabletransportation costinstallation cost

《太阳能》 2026 (8)

40-50,11

四川省中央引导地方科技发展专项(2024ZYD0250)四川省重大科技专项项目(2024ZDZX003)

10.19911/j.1003-0417.tyn20250609.01