陆上平原地区风电项目施工风险管控浅析OA
BRIEF ANALYSIS ON CONSTRUCTION RISK MANAGEMENT AND CONTROL OF WIND POWER PROJECTS IN ONSHORE PLAIN AREAS
随着"双碳"目标的深入推进,混凝土-钢混合塔筒因在刚度和经济性上的显著优势,已成为陆上平原地区高塔筒风电项目的主流选择.然而,此种塔筒的施工工艺复杂,叠加平原地区特有的软土地质、季节性强风及密集的交叉作业,给项目管理带来了严峻挑战.首先分析了风电机组选址与村民阻工引发的项目进度滞后风险,揭示了村民阻工对工期的深层影响根源;然后剖析了塔筒吊装施工中因同心度偏差、预应力张拉及涡激振动等因素引发的安全风险,并提出了相应的技术管控与防范措施;与此同时,分析了风电机组的机舱、叶片等吊装时的安全分析与应对措施.研究结果表明:1)项目进度风险主要源于外部协调与内部管理双重因素.风电机组选址需统筹技术条件与社会环境要素,应重点关注已批未建设施的避让及民俗敏感区的摸排;村民阻工是进度滞后的核心诱因,其本质多为补偿利益纠纷.2)混凝土-钢混合塔筒中钢塔段的吊装作业是施工安全管控的重中之重.塔筒对安装精度要求极高,施工中需严格把控同心度测量,确保结构受力符合设计工况.预应力张拉作为连接塔筒与基础的关键工序,易形成交叉作业,应特别注意进行风险识别和安全管控,并规范钢绞线切割工艺.3)应重视风速带来的施工安全风险.平原地区突发性强风易引发塔筒钢塔段产生涡激振动,必须综合运用扰流板、缆风绳等物理防振措施,并结合气象预测,利用窗口期连续作业,以降低项目施工安全风险.
With the deepening of the emission peak and carbon neutrality goals,concrete-steel hybrid tower has become the mainstream choice for high tower wind power projects in onshore plain areas due to their significant advantages in stiffness and economy.However,the construction process of this type of tower is complex,coupled with the unique soft soil geology,seasonal strong winds,and intensive cross operations in plain areas,which pose severe challenges to project management.This paper first analyzes the risk of project schedule delay caused by the location selection of wind turbines and the obstruction of construction by villagers,revealing the deep-seated impact of villagers'obstruction on the construction period.Then,the safety risks caused by concentricity deviation,prestressing tension,and vortex induced vibration during tower hoisting construction are analyzed,and corresponding technical control and prevention measures are proposed.At the same time,safety analysis and response measures are analyzed for the hoisting of wind turbine cabins,blades,and other components.The research results show that:1)Project schedule risks mainly stem from dual factors of external coordination and internal management.The site selection of wind turbines should take into account both technical conditions and social environmental factors,with a focus on avoiding approved but undeveloped facilities and conducting surveys of sensitive areas with folk customs.Villagers'obstruction of work is the core cause of delayed progress,and its essence is often a dispute over compensation interests.2)The lifting operation of the steel tower section in the concrete-steel hybrid tower is of utmost importance for construction safety management and control.The tower requires extremely high installation accuracy,and strict control of concentricity measurement is required during construction to ensure that the structural stress meets the design conditions.Prestressing tensioning,as a key process connecting tower and foundation,is prone to cross operation.Special attention should be paid to risk identification and safety management and control,and the steel strand cutting process should be standardized.3)Attention should be paid to the construction safety risks caused by wind speed.Sudden strong winds in plain areas can easily cause vortex induced vibration in steel tower sections.It is necessary to comprehensively use physical vibration prevention measures such as spoilers and cable wind ropes,combined with meteorological forecasting,and use continuous operation during the window period to reduce project construction safety risks.
谭璐;洪文祯
安徽省皖能能源交易有限公司,合肥 230011安徽省皖能能源交易有限公司,合肥 230011
信息技术与安全科学
风电项目风电机组陆上平原地区风险管控混凝土-钢混合塔筒
wind power projectwind turbineonshore plain arearisk management and controlconcrete-steel hybrid tower
《太阳能》 2026 (8)
23-27,5
评论