某流域梯级水电枢纽群连溃风险分析及溃坝过程模拟OA

Risk Analysis and Dam-break Process Simulation of Cascading Failure in a Cascade Hydropower System within a River Basin

中文摘要英文摘要

极端荷载下,流域梯级枢纽群薄弱梯级一旦失事极易导致流域性灾害发生.本文以 MSKN-SPL-AETS 梯级水电站系统为研究对象,考虑洪水和地震风险对系统运行风险的影响,明晰了枢纽群失效路径,开展了枢纽群级联溃坝模型数值模拟研究.结果表明:通过 MSKN 水电站调洪后,流域性的洪水风险降低,枢纽群运行不受超标准洪水影响;在超设计标准地震荷载作用下,由 MSKN 引发的级联溃坝极易导致下游 SPL 水电站发生全断面溢流而漫顶溃坝,且洪水演进过程具有一定的级联放大效应,而依托 AETS 水利枢纽及时的应急调度,可实现对该链式风险的有效管控.研究提出的枢纽群连溃风险分析与模拟方法可为流域性枢纽群应急预案编制与应急防控提供技术支撑.

Under extreme loading conditions,the failure of a weak link within a cascade hydropower system can readily trigger basin-scale catastrophic disasters.Taking a cascade hydropower system MSKN-SPL-AETS in a representative river basin as a case study,and considering the impacts of flood and seismic hazards on the operational risk of the system,the failure pathways of the cascade system are identified,and a numerical simulation framework for cascading dam-break processes is established.The results indicate that:(a)after the flood regulation by MSKN Hydropower Station,the basin-wide flood risk is significantly reduced,ensuring that the cascade system remains unaffected by extreme flood events exceeding design standards;and(b)under seismic loading beyond the design basis,cascading dam failure initiated at MSKN is highly likely to induce full-section overflow and overtopping failure at the downstream SPL Hydropower Station,and the flood propagation process exhibits a pronounced cascading amplification effect,but timely emergency regulation of the AETS Hydraulic Project can effectively mitigate and control this chain-type risk.The proposed risk analysis and simulation methodology for cascading failures of hydropower systems can provide technical support for the formulation of emergency response plans and basin-scale risk management of cascade hydropower projects.

李思宇;丁凌园;黄健;单熠博;沈光泽;钟启明

中国电建集团贵阳勘测设计研究院有限公司,贵州 贵阳 550081南京水利科学研究院,江苏 南京 210024华电昆仑喀什能源开发有限公司,新疆 喀什 844000南京水利科学研究院,江苏 南京 210024||水利部水库大坝安全重点实验室,江苏 南京 210029南京水利科学研究院,江苏 南京 210024||水利部水库大坝安全重点实验室,江苏 南京 210029南京水利科学研究院,江苏 南京 210024||水利部水库大坝安全重点实验室,江苏 南京 210029

建筑与水利

水电枢纽群溃坝路径溃坝洪水风险分析数值模拟

cascade hydropower systemdam-break failure pathwaydam-break floodrisk analysisnumerical simulation

《水力发电》 2026 (9)

31-37,7

国家重点研发计划(2024YFC3210602)国家自然科学基金资助项目(52409138,52309159,U24A20182)水灾害防御全国重点实验室2025年度创新基金项目(Yk325002)