硬梁包引水隧洞工程部分洞段全断面高岭土化蚀变,地质条件复杂,稳定性极差.全断面高岭土上半洞开挖支护完成后,自2022年5月20日开始,受周边频繁地震影响,对下层开挖支护安全影响较大,通过现场多次生产性试验成果总结,并结合现场实践经验,对全断面高岭土化蚀变岩洞段中下层开挖施工技术进行分析,针对全断面高岭土洞段开挖支护过程中遇到的重难点问题,制定可行的处理措施和设置合理的开挖支护参数,提出了"超前径向加固+分层非爆破开挖+底脚加强锁定+快速封闭衬砌"的综合施工技术.通过引入恒阻大变形(NPR)锚索与钢管桩条带加强体系,有效抑制了围岩松弛.现场应用表明:"围岩变形控制在100 mm内,确保了地震频发区的施工安全".从而保证了长大引水隧洞高岭土蚀变段开挖支护安全,该施工技术为后续类似工程施工提供经验借鉴.

Certain sections of the headrace tunnel of Yingliangbao Hydropower Project are characterized by full-section kaolinized alteration,complex geological conditions,and extremely poor surrounding rock stability.Af-ter the excavation and support of the upper bench of the full-section kaolinized rock was completed,frequent earthquakes in the surrounding area starting from May 20,2022 exerted severe adverse impacts on the safety of the excavation and support for the lower benches.Based on multiple on-site production tests and practical con-struction experience,this paper analyzes the construction technology for the excavation and support of the mid-dle and lower benches in the full-section kaolinized altered rock section.Aiming at key challenges encountered during the excavation and support,feasible countermeasures are formulated and rational excavation and support parameters are determined.A comprehensive construction technology consisting of advanced radial grouting,layered non-blasting excavation,enhanced foot locking and rapid closed lining is proposed.Furthermore,an NPR anchor cable and steel pipe pile strip reinforcement system is introduced to effectively control surrounding rock relaxation.Field application results show that the surrounding rock deformation is controlled within 100 mm,ensuring construction safety in the earthquake-prone area.This technology ensures the safety of excava-tion and support in the kaolinized altered rock sections of the long large-section headrace tunnel and provides a valuable reference for similar projects in the future.

陶元贵;季永春;温哲昊;杜奇龙;张晓东

中国安能集团第三工程局有限公司,四川 成都 611130中国安能集团第三工程局有限公司,四川 成都 611130四川华能泸定水电有限公司,四川 泸定 626100四川华能泸定水电有限公司,四川 泸定 626100中国安能集团第三工程局有限公司,四川 成都 611130

建筑与水利

引水隧洞高岭土蚀变岩重难点开挖支护

headrace tunnelkaolinaltered rockkey challengesexcavation and support