以硬梁包水电站地下超大型长廊阻抗式调压室为研究对象,系统性总结硬梁包水电站调压室下部安全贯通施工技术.硬梁包水电站调压室结构复杂、开挖深度大、围岩应力集中.施工通过地质分析与数值模拟,明确围岩变形与应力分布特征,提出以预支护、控制爆破、分区分块开挖及贯通加固为核心的施工技术方案,配套布设变形监测系统实时掌握围岩状态.工程实践表明,该技术体系能有效控制爆破振动,保障结构稳定,实现调压室底部高质量成型与安全贯通.技术成果可为同类工程提供重要的参考.

Taking the underground super-large gallery-type throttled surge chamber of Yingliangbao Hydropow-er Project as the research object,this paper systematically summarizes the construction technology for safe breakthrough of the lower-section of the surge chamber.The surge chamber features complex structure,large excavation depth and significant stress concentration in the surrounding rock.Based on geological analysis and numerical simulation,the deformation characteristics and stress distribution of the surrounding rock are clari-fied.A construction technology scheme centering on pre-supporting,controlled blasting,zoned-block excava-tion and breakthrough reinforcement is proposed.A deformation monitoring system is established to track the surrounding rock conditions in real time.Engineering practice shows that this technical system can effectively control blasting vibration,ensure structural stability and achieve high-quality formation and safe breakthrough of the lower section of the surge chamber.The technical achievements can provide an important reference for similar projects.

闫生存;王雅儒;纳小平;魏小令

四川华能泸定水电有限公司,四川 泸定 626100中国水利水电建设工程咨询中南有限公司,湖南 长沙 410000中国水利水电第五工程局有限公司,四川 成都 610066四川华能泸定水电有限公司,四川 泸定 626100

建筑与水利

地下埋藏调压室控制爆破安全贯通变形监测

underground surge chambercontrolled blastingsafe breakthroughdeformation monitoring

《四川水力发电》 2026 (4)

1-7,7

10.20196/j.cnki.scslfd.20260401