装配式钢结构厂房Tekla模型快速施工体系研究与应用OA

Research and application of rapid construction system based on Tekla structural model for prefabricated steel structure factory building

中文摘要英文摘要

为提高装配式钢结构厂房的施工效率与质量控制水平,解决传统施工中信息传递失真、协同效率低等痛点,文章提出了一种基于 Tekla 模型的全周期快速施工技术体系.该体系以高精度三维模型为核心,贯通设计、预制、施工与运维全过程,通过碰撞检测、施工模拟与精准算量等关键技术,实现施工前端的精准预控与全过程数字化管理.在天长超隆厂房项目的应用表明,该技术使材料浪费率降至 3%,返工率控制在1%,工期缩短约 22%,综合经济效益提升约 24%.研究成果为大型钢结构工程的数字化、精益化施工提供了可复制的技术路径与实践范例.

To enhance the construction efficiency and quality control level of prefabricated steel structure plants,and address issues such as distorted information exchange and low collaboration efficiency in traditional con-struction,this paper proposes a rapid construction technology system based on the Tekla model for full lifecycle management.This system,centered on a high-precision 3D model,integrates the entire process from design and prefabrication to construction and operation and maintenance.Through key technologies like clash detec-tion,construction simulation,and accurate quantity takeoff,it realize precise pre-control in the early construc-tion stage and full-process digital management.Application in the Tianchang Chaolong Plant Project demon-strates that this technology reduces material waste rate to 3%,controls the rework rate to 1%,shortens the construction period by approximately 22%,and improves comprehensive economic benefit by about 24%.The research results delivers replicable technical solutions and practical example for the digital and lean construction of large-scale steel structure projects.

高青松

中国水利水电第十工程局有限公司,四川 成都 610218

建筑与水利

Tekla模型装配式钢结构全周期管理快速施工数字化建造

Tekla modelprefabricated steel structurefull lifecycle managementrapid constructiondigital con-struction

《四川水力发电》 2026 (z1)

77-80,4

10.20196/j.cnki.scslfd.2026S115