首页|期刊导航|科技创新与应用|复杂地质条件下高土石坝渗流控制与防渗结构优化设计研究

复杂地质条件下高土石坝渗流控制与防渗结构优化设计研究OA

中文摘要英文摘要

针对复杂地质状况,高土石坝面临渗流场分布复杂及潜在渗透破坏风险高等情形,该文选取锦屏一级、小湾、龙滩等典型工程作为研究对象,采用现场监测、数值模拟和优化设计相结合的办法,剖析地质非均质性对坝体渗流场产生的影响,构建防渗墙与心墙协同优化设计体系.研究成果显示,综合控制措施可大幅降低渗流量并提高坝体整体安全系数,为高土石坝防渗体系设计及长期运行提供科学支撑.

In view of complex geological conditions,high earth-rock dams are faced with complex seepage field distribution and high potential seepage damage risks.This paper selects typical projects such as Jinping Level 1,Xiaowan and Longtan as research objects,and adopts on-site monitoring,numerical simulation and optimization design.The combination of methods analyzes the impact of geological heterogeneity on the seepage field of the dam body,and constructs a collaborative optimization design system for impervious walls and core walls.The research results show that Comprehensive control measures can greatly reduce seepage flow and improve the overall safety factor of the dam body,providing scientific support for the design and long-term operation of the anti-seepage system of high earth-rock dams.

白新革;郑帅杰;张智沛

黄河勘测规划设计研究院有限公司,郑州 450000黄河勘测规划设计研究院有限公司,郑州 450000黄河勘测规划设计研究院有限公司,郑州 450000

建筑与水利

高土石坝渗流控制防渗结构优化复杂地质数值模拟

high earth-rock damseepage controloptimization of anti-seepage structurecomplex geologynumerical simulation

《科技创新与应用》 2026 (24)

141-144,4

10.19981/j.CN23-1581/G3.2026.24.033

评论