基于线性交流潮流的频率约束机组组合模型研究OA
Frequency-constrained unit commitment model based on linear AC power flow
大规模可再生能源并网导致电力系统旋转惯量降低.为保证系统频率安全,提出一种基于线性交流潮流的频率约束机组组合模型.首先,提出了一种基于混合整数二阶锥松弛的机组组合模型,将交流潮流模型与机组组合模型结合,得到能够较准确刻画电网潮流分布的机组组合模型.然后,为保证系统频率安全稳定,考虑频率相关约束,构建基于混合整数二阶锥松弛的频率约束机组组合模型.最后,提出一种两阶段递进优化策略,通过协同求解频率约束机组组合模型与多时段最优潮流问题实现解的精确性提升.采用改进的IEEE118节点算例验证所提模型的有效性.
The large-scale integration of renewable energy into power grids has led to a significant reduction in power system rotational inertia.To ensure system frequency security,a frequency-constrained unit commitment model based on linear AC power flow is proposed.First,a unit commitment model based on mixed integer second-order cone relaxation is developed.The AC power flow model is combined with the unit commitment model to establish a unit commitment model that can accurately characterize power flow distribution within the network.Second,to ensure the security and stability of the system frequency,frequency-related constraints are incorporated into the model,and a frequency-constrained unit commitment model based on mixed-integer second-order cone relaxation is constructed.Finally,a two-stage progressive optimization strategy is proposed to improve the accuracy of the solution by collaboratively solving the frequency-constrained unit commitment model and the multi-period optimal power flow problem.The effectiveness of the proposed model is verified using a modified IEEE 118-bus system.
孙康;李雅然;李群;张宁宇;孙国强;王齐辉;卫志农
河海大学电气与动力工程学院,江苏 南京 211100国网江苏省电力有限公司电力科学研究院,江苏 南京 211103||国网江苏省电力有限公司,江苏 南京 210000国网江苏省电力有限公司电力科学研究院,江苏 南京 211103||国网江苏省电力有限公司,江苏 南京 210000国网江苏省电力有限公司电力科学研究院,江苏 南京 211103||国网江苏省电力有限公司,江苏 南京 210000河海大学电气与动力工程学院,江苏 南京 211100河海大学电气与动力工程学院,江苏 南京 211100河海大学电气与动力工程学院,江苏 南京 211100
可再生能源二阶锥松弛频率约束机组组合两阶段递进优化
renewable energysecond-order cone relaxationfrequency-constrained unit commitmenttwo stage progressive optimization
《电力系统保护与控制》 2026 (16)
143-152,10