浅淡水库工程集运鱼系统设计方法与过程OA
Brief Discussion on the Design Method and Process of Fish Collection and Transport System for Reservoir Projects
水库大坝建设会直接影响河流连续性,进而影响鱼类洄游和基因交流,修建过鱼设施是减轻大坝建设对鱼类影响的有效措施之一.集运鱼系统作为常用过鱼设施,其设计与鱼类时空分布、生存环境、生活习性和游泳能力等因素有关,设计重点主要包括进鱼口位置、结构和运行水位等.本文通过总结分析具体工程集运鱼系统设计,基于工程所在区域鱼类游泳能力测试结果,结合工程枢纽布置与特征水位,介绍集运鱼系统设计方法与过程,可供类似工程设计参考.
The construction of reservoir dams directly affects river continuity,thereby impacting fish migration and genetic exchange.Constructing fish passage facilities is one of the effective measures to mitigate the impacts of dam construction on fish.As a commonly adopted fish passage facility,the design of fish collection and transport system is related to factors such as the spatiotemporal distribution of fish,habitat environment,living habits,and swimming capacity,with the design focus mainly including the location and structure of the fish entrance and the operating water levels.By summarizing and analyzing the design of fish collection and transport system for specific project,and based on the swimming capacity test results of fish in the project area,combined with the project layout and characteristic water levels,this paper presents the design method and process of the fish collection and transport system,which can serve as a reference for the design of similar projects.
贾帅静;李耀辉
中水北方勘测设计研究有限责任公司,天津 300222中水北方勘测设计研究有限责任公司,天津 300222
建筑与水利
鱼类过坝集运鱼系统游泳能力测试放流系统
fish passage over damfish collection and transport systemswimming capacity testfish release system
《海河水利》 2026 (z1)
168-172,5
评论