Leakage Control Technology for the Bottom Sill of Miter Gates in Ship Locks

中文摘要英文摘要

以北运河木厂船闸工程为研究对象,针对人字闸门与底坎间渗漏量超标问题开展技术研究.采用流速仪法对40个检测点进行渗漏量检测,结果表明,合格率仅为72.5%,明显低于规范要求的90%.通过分层分析法识别出"底坎表面平整度不满足要求"是导致渗漏量超标的主要原因,占比达81.8%,其中转角部位问题最为突出,占比为77.8%.进一步通过要因确认试验,确定"转角部位打磨不彻底"为关键技术问题.针对该问题,提出采用角磨机精细打磨的处理方案.实施结果表明,渗漏量合格率提升至94.2%,超过预期目标值92%.研究成果可为同类船闸工程闸门止水系统施工质量控制提供参考.

Taking the Muchang Ship Lock Project on the North Canal as the research subject,this study conducts technical research on the issue of excessive leakage between the miter gates and the bottom sill.Using the current meter method,leakage detection is conducted at 40 monitoring points.The results show that the qualification rate is only 72.5%,significantly lower than the 90%requirement specified in the relevant code.Through hierarchical analysis,it is identified that"insufficient flatness of the bottom sill surface"is the primary cause of excessive leakage,accounting for 81.8%of the total,with the corner areas being the most critical,accounting for 77.8%.Further cause-verification tests confirm that"inadequate grinding of the corner areas"is the key technical issue.To address this problem,a treatment scheme using angle grinders for fine grinding is proposed.Implementation results demonstrate that the leakage qualification rate increases to 94.2%,exceeding the expected target value of 92%.The research findings can serve as a reference for quality control of gate sealing system construction in similar ship lock projects.

霍晓峰

华北水利水电工程集团有限公司,天津 300000

建筑与水利

船闸工程人字闸门底坎渗漏表面平整度止水系统质量控制

ship lock projectmiter gatebottom sill leakagesurface flatnesssealing systemquality control

《海河水利》 2026 (z1)

163-167,5

10.3969/j.issn.1004-7328.2026.增刊1.030

评论