首页|期刊导航|海河水利|大型水库水温预测及分层取水措施研究

大型水库水温预测及分层取水措施研究OA

Water Temperature Prediction and Stratified Water Intake Measures for Large Reservoirs

中文摘要英文摘要

为研究大型水库库区水温结构、下泄水温影响以及分层取水措施的改善效果,本文以代古寺水库为研究对象,通过构建宽度平均的立面二维水温模型,基于单层取水、叠梁门分层取水和多层固定取水口等5种工况,对代古寺水库的水温分布及下泄水温变化进行了定量分析.研究结果表明,代古寺水库4-9月存在明显的水温分层现象,单层取水方案下会对下游造成低温水效应,叠梁门方案4-7月下泄水温比单层取水最大可提高2.5℃,4层固定取水口的增温效果比叠梁门相对弱0.2~0.6℃.水库下泄水温存在明显的延迟现象,但采用分层取水措施后得到了部分缓解.研究结果可为大型水库的分层取水措施设计和优化水库调度提供参考.

To investigate the water temperature structure in large reservoir areas,the impact of discharged water temperature,and the improvement effect of stratified water intake measures,this paper,taking Daigusi Reservoir as the research object,constructed a width-averaged vertical two-dimensional water temperature model,and conducted quantitative analysis of water temperature distribution and discharged water temperature variation under five operational conditions including single-layer water intake,stacked beam gate stratified water intake,and multi-layer fixed water intake outlets.The results indicate that obvious water temperature stratification existed in Daigusi Reservoir from April to September;the single-layer water intake scheme caused low-temperature water effects on the downstream;the stacked beam gate scheme increased discharged water temperature by up to 2.5℃compared with single-layer water intake from April to July;the warming effect of the four-layer fixed water intake outlets was relatively 0.2-0.6℃weaker than that of the stacked beam gate.Significant delay phenomena existed in reservoir discharged water temperature,but were partially alleviated after adopting stratified water intake measures.The research findings can provide references for the design of stratified water intake measures and optimal reservoir operation of large reservoirs.

陆晓华;王祖琨

中水北方勘测设计研究有限责任公司,天津 300222中水北方勘测设计研究有限责任公司,天津 300222

建筑与水利

大型水库水温分层取水

large reservoirwater temperaturestratified water intake

《海河水利》 2026 (z1)

151-158,8

10.3969/j.issn.1004-7328.2026.增刊1.028

评论