抽水蓄能电站水土保持设施验收有关问题探讨OA
Discussion on Issues Concerning Acceptance of Soil and Water Conservation Facilities in Pumped Storage Power Stations
以河北丰宁抽水蓄能电站为例,探讨了水土保持分阶段验收模式在建设周期长、分批投产的抽水蓄能电站项目中的适用性与实施路径.针对《中华人民共和国水土保持法》中"三同时"要求与抽水蓄能电站分批投产矛盾及《水电工程水土保持设施验收规程》中阶段验收不适用的问题,采用案例分析与政策梳理相结合,围绕工程实际进展与水土保持"三同时"制度之间的衔接展开研究.结论表明,通过合理划分阶段验收范围、细化六项指标计算,分阶段验收模式可有效协调工程分期投产与水土保持验收之间的时序矛盾,实现"边建设、边修复、边验收"的良性管控机制.河北丰宁抽水蓄能电站分阶段验收为同类项目的水土保持验收提供可借鉴的管理思路,同时为推动相关规范在分阶段验收范围、标准及程序方面的完善提供实践依据.
Taking the Hebei Fengning Pumped Storage Power Station as an example,this paper discussed the applicability and implementation path of the phased acceptance mode for soil and water conservation in pumped storage power station projects with long construction periods and batch commissioning.Aiming at the contradiction between the"three simultaneous"requirements in the Law of the People's Republic of China on Soil and Water Conservation and the batch commissioning of pumped storage power stations,as well as the inapplicability of phased acceptance in the Acceptance Specification for Soil and Water Conservation Engineering of Hydropower Project,this paper employed a combination of case analysis and policy review,focusing on the connection between actual project progress and the"three simultaneous"system for soil and water conservation.The results indicate that through reasonable division of phased acceptance scope and refinement of six-indicator calculation,the phased acceptance mode can effectively coordinate the temporal contradiction between project phased commissioning and soil and water conservation acceptance,achieving a benign control mechanism of"construction,restoration,and acceptance simultaneously".The phased acceptance of the Hebei Fengning Pumped Storage Power Station provides referable management ideas for soil and water conservation acceptance of similar projects,and simultaneously provides practical basis for promoting the improvement of relevant codes in terms of phased acceptance scope,standards,and procedures.
孔德轩;姚玉梅;凌峰;付有
河北丰宁抽水蓄能有限公司,河北 承德 067000水利部海河水利委员会海河流域水土保持监测中心站,天津 300170水利部海河水利委员会海河流域水土保持监测中心站,天津 300170河北丰宁抽水蓄能有限公司,河北 承德 067000
建筑与水利
抽水蓄能电站水土保持分阶段验收三同时制度
pumped storage power stationsoil and water conservationphased acceptance"three simultaneous"system
《海河水利》 2026 (z1)
129-133,5
评论