灌排两用泵站重建工程防洪评价要点分析OA
Key Points for Flood Control Assessment in Reconstruction Project of Irrigation-Drainage Dual-Purpose Pumping Station
灌排两用泵站重建工程通常涉及穿堤施工,这将对堤防安全与河道行洪产生不利影响.为系统识别此类工程防洪评价的关键技术要点,本文以潮白新河左堤潮东泵站更新改造工程为例,在50 a一遇防洪标准下,采用恒定非均匀流方法推求设计水位,运用张瑞瑾公式计算排涝与行洪工况下的局部冲刷深度,并开展堤防渗流及边坡稳定分析,同时评估工程与相关规划的符合性及施工期破堤、基坑开挖、防汛抢险等风险.结果表明:排涝工况下引渠不产生冲刷,行洪工况下滩地冲刷深度为1.08 m,需采取硬质防护;堤防稳定满足规范要求;在落实专项施工方案、变形监测及降水控制等措施后,工程对堤防及防汛抢险的影响可控.该分析案例可为类似灌排泵站涉河建设的防洪评价提供技术参考.
Reconstruction projects of irrigation-drainage dual-purpose pumping stations usually involve dike-crossing construction,which will adversely affect dike safety and river flood discharge.To systematically identify key technical points for flood control assessment of such projects,this paper takes the Chaodong Pumping Station Renovation and Reconstruction Project on the left dike of Chaobai New River as an example.Under the 50-year flood control standard,the design water level is calculated using the steady non-uniform flow method,local scour depth under drainage and flood discharge conditions are computed using the Zhang Ruijin formula,and dike seepage and slope stability analyses are carried out.Meanwhile,the compliance of the project with relevant planning and risks including dike breaking during construction period,foundation pit excavation,and flood emergency rescue are assessed.The results indicate that no scour occurs in the approach channel under drainage conditions,while the scour depth on the floodplain under flood discharge conditions is 1.08 m,requiring rigid protection measures.Dike stability meets code requirements of relevant specifications.With the implementation of special construction schemes,deformation monitoring,and dewatering control measures,the impact of the project on dike and flood emergency rescue is controllable.This analysis case can provide technical references for flood control assessment of similar irrigation-drainage pumping station projects involving river construction.
李梦雨;陈雨琦;王雯涛
河北省水利水电勘测设计研究院集团有限公司,天津 300220河北省水利水电勘测设计研究院集团有限公司,天津 300220河北省水利水电勘测设计研究院集团有限公司,天津 300220
建筑与水利
防洪评价泵站重建堤防稳定穿堤施工施工期影响
flood control assessmentpumping station reconstructiondike stabilitydike-crossing constructionconstruction period impact
《海河水利》 2026 (z1)
114-118,5
评论