石漕沟水库枢纽工程规模论证OA
Demonstration of Project Scale for Shicaogou Reservoir Hub Project
引水式水库工程规模的确定相较于传统水库有较大区别,工程体系相对复杂,引水系统与调蓄水库规模耦合、枯水年水量约束强、工程投资与效益平衡难度大等技术难点,其规模论证需统筹水文、地质、工程、经济、生态等多维度要素,较常规水库更为复杂.石漕沟水库枢纽工程位于阜平县葛家台沟,承担县城及周边生活、灌溉供水任务,由龙王庄壅水坝、引水隧洞和石漕沟水库组成.通过分析龙王庄引水隧洞不同引水规模和引水时段对水库规模的影响,从而确定整个系统工程的规模.以期为同类型综合利用水利枢纽工程建设规模论证提供借鉴.
Compared with conventional reservoirs,the determination of project scale for diversion-type reservoir projects has significant differences,with a relatively complex engineering system.Technical difficulties include the coupling between diversion system and regulation reservoir scale,strong water quantity constraints in dry years,and the difficulty in balancing engineering investment and benefits.The scale demonstration requires the coordination of multi-dimensional elements including hydrology,geology,engineering,economy,and ecology,which is more complex than conventional reservoirs.The Shicaogou Reservoir Hub Project is located in Gejiatai Gully,Fuping County,undertaking water supply tasks for domestic and irrigation use in the county town and surrounding areas,and consists of the Longwangzhuang barrage dam,diversion tunnel,and Shicaogou Reservoir.By analyzing the influence of different diversion scales and diversion periods of the Longwangzhuang diversion tunnel on the reservoir scale,the scale of the entire system project was determined.This study aims to provide reference for the scale demonstration of similar multi-purpose water conservancy hub projects.
赵祥;刘宁
中水北方勘测设计研究有限责任公司,天津 300202中水北方勘测设计研究有限责任公司,天津 300202
建筑与水利
引水式水库水资源配置引水隧洞规模水库规模阜平县
diversion-type reservoirwater resources allocationdiversion tunnel scalereservoir scaleFuping County
《海河水利》 2026 (z1)
109-113,5
评论