北运河木厂船闸振冲碎石桩复合地基处理研究OA
Composite Ground Treatment of Vibro-Replacement Stone Column for Muchang Ship Lock on the North Canal
北运河木厂船闸施工区域为Ⅷ度地震区,地质勘察显示上部承载力不足、中部饱和砂层存在地震液化风险等隐患.以该工程振冲碎石桩复合地基处理为研究对象,围绕3大核心问题展开研究:设计参数优化与地质适配性、桩身密实度与透水性调控、多种方法检测与效果评价.研究表明,优化后的设计参数可适配场地地质,解决上部承载力不足问题;合理控制施工工艺可提升桩身密实度,确保透水性达标;多种检测方法验证显示,复合地基液化等级控制在不液化—轻微液化范围,承载力达180 kPa以上.研究结果可为同类地质及地震区工程提供理论与实践参考.
The construction area of Muchang Ship Lock on the North Canal is located in a seismic zone of intensity VIII.Geological investigation revealed hidden dangers including insufficient bearing capacity in the upper layer and seismic liquefaction risk in the middle saturated sand layer.Taking the composite ground treatment of vibro-replacement stone column of this project as the research object,this paper focused on three core issues:optimization of design parameters and geological adaptability,control of pile compactness and permeability,and multi-method testing and effect evaluation.The results indicate that optimized design parameters can adapt to site geology and solve the problem of insufficient upper bearing capacity;reasonable control of construction technology can improve pile compactness and ensure permeability meets standards;verification by multiple testing methods shows that the liquefaction grade of composite ground is controlled within the non-liquefaction to slight liquefaction range,with bearing capacity reaching over 180 kPa.The research can provide theoretical and practical references for projects with similar geological conditions in seismic zones.
代培基;刘华夏
天津市水务工程建设事务中心,天津 300204天津市水务工程建设事务中心,天津 300204
建筑与水利
船闸振冲碎石桩复合地基
ship lockvibro-replacement stone columncomposite ground
《海河水利》 2026 (z1)