榕江关埠引水工程水力过渡过程研究OA
Study on the Hydraulic Transition Process of the Rongjiang Ganbu Water Diversion Project
基于一维数值模拟,对榕江关埠引水工程进行水力过渡过程研究,讨论了泵后阀关闭规律对水泵转速和阀后压力的影响,泵后阀关闭规律应当综合考虑二者,选取较优的关阀规律.相比于在泵后设置简单调压室而言,在沿线设置阻抗调压室可以取得良好的水锤防护效果,能有效防止调压室漏空和管道沿线出现负压,避免液柱分离现象的发生.该结论对于指导类似输水工程建设具有一定的实际参考价值.
Through one-dimensional numerical simulations,this study investigates the hydraulic transition process of the Rongjiang Guanbu Water Diversion Project.It analyzes how the closing pattern of the post-pump valve affects both pump speed and downstream pressure.The research demonstrates that a combined evaluation of the valve's closing mechanism and operational parameters is essential to determine the optimal closing pattern.Compared to conventional post-pump pressure regulation chambers,installing impedance-based pressure regulation chambers along the pipeline demonstrates superior water hammer protection.This configuration effectively prevents chamber leakage and negative pressure formation in pipelines,while avoiding liquid column separation.These findings provide practical guidance for similar water conveyance projects.
甘大钦
广东省粤东三江连通建设有限公司,广州 510000
建筑与水利
长距离输水一维数值模拟调压室水锤计算榕江关埠引水工程
long distance water conveyanceone-dimensional numerical simulationpressure regulating chamberwater hammer calculationRongjiang Guanbu Water Diversion Project
《广东水利水电》 2026 (8)
72-78,7
评论