抽水蓄能电站洪水调节时段选择浅析OA
A Brief Analysis on the Selection of Flood Operation Period for Pumped Storage Power Stations
由于抽水蓄能电站多选址在深山峡谷,设计洪水常呈现"汇流迅猛、涨落陡峭、历时短暂"的典型特征,且电站发电过程随时都有可能与洪水遭遇,而时段步长作为洪水调节过程中离散化求解的基本时间单位,其长短直接影响到水位计算的精度.研究以DB、SYS、SZS、TC 4座抽水蓄能电站为例,分析了洪水调节计算时段步长对设计、校核水位的影响.结果表明,当调洪时段步长缩短至0.167 h时,4座电站调洪水位均满足精度要求,可为类似工程设计提供参考.
Due to the typical location of pumped storage power stations in deep mountains and gorges,their design floods exhibit typical characteristics such as"rapid convergence,steep rise and fall,and short duration."Moreover,the power generation process may coincide with flood events at any time.The time step,as the fundamental unit for discretized solution in flood regulation,directly affects the accuracy of water level calculations.This study takes four pumped storage power stations—DB、SYS、SZS and TC as examples to analyze the impact of the flood regulation time step on the design and check water levels.The results indicate that when the flood regulation time step is reduced to 0.167h,the flood regulation water levels of four stations meet the accuracy requirements.This finding can serve as a reference for similar engineering designs.
杨会娟
广东省水利电力勘测设计研究院股份有限公司,广州 510635
建筑与水利
抽水蓄能电站洪水调节时段步长滑动叠加组合
pumped storage power stationflood operationperiodsliding superposition combination
《广东水利水电》 2026 (8)
28-34,7