防渗墙刺入黏土心墙非线性法向接触模型研究OA
Nonlinear Normal Contact Model for Cutoff Wall Penetration into Clay Core Wall
防渗墙与心墙是土石坝渗流控制的关键结构,但目前针对防渗墙与心墙界面接触力学行为仍缺乏深入研究.为此,通过自主设计的模型试验装置,采用黏土制备试样,并分别施加100、300、500 kPa上覆压力,基于墙端压力-刺入位移试验数据,建立了双曲线型非线性法向接触模型.该模型描述防渗墙刺入黏土心墙的过程中墙端压力与刺入位移呈现显著非线性特征,并通过不同上覆压力下的试验数据验证了该模型的适用性.同时基于该模型开展了相应的数值模拟分析,有限元计算结果和模型试验结果基本一致,说明了所提双曲线型非线性法向接触模型的有效性.研究成果揭示了防渗墙刺入黏土心墙的力学行为规律,为防渗墙与心墙相互作用分析提供了理论依据,对实际工程中的防渗墙稳定性评估具有重要参考价值.
[Objective]To address the insufficient understanding of the mechanical contact behavior at the interface between a cut-off wall and a clay core wall in earth-rockfill dams,this study aims to investigate the nonlinear nor-mal contact relationship developed during the penetration of a cut-off wall into a clay core wall.The mechanical in-teraction between the cut-off wall and the core wall is a key factor affecting the deformation compatibility and overall stability of seepage-control systems in earth-rockfill dams.However,the wall-end resistance mobilization mechanism and its dependence on overburden pressure have not been fully clarified.Therefore,this study focuses on establis-hing an experimentally validated nonlinear normal contact model that can describe the relationship between wall-end pressure and penetration displacement,and further evaluates its applicability through numerical simulation.[Methods]A self-developed model test apparatus was designed to simulate the penetration process of a cut-off wall into a clay core wall.Clay specimens were prepared to represent the core wall material,and three levels of overbur-den pressure(100,300,and 500 kPa)were applied to investigate the influence of vertical stress conditions on the penetration behavior.A hyperbolic nonlinear normal contact model was proposed and calibrated to describe the me-chanical relationship between wall-end pressure and penetration displacement.The proposed model was introduced into finite element numerical simulations to reproduce the penetration process to verify its effectiveness and applica-bility.[Results]The relationship between wall-end pressure and penetration displacement exhibits significant non-linear characteristics during the penetration of the cut-off wall into the clay core wall.Under a constant overburden pressure,the wall-end resistance increases rapidly at the initial stage while the penetration displacement changes only slightly,indicating that the clay core wall provides a high initial resistance to wall penetration.As penetration continues,the increase rate of wall-end pressure gradually decreases,and the displacement begins to increase more noticeably.At the later stage,the penetration displacement increases substantially,whereas the growth rate of wall-end pressure becomes much smaller.This behavior indicates that the soil structure near the wall end is progressively disturbed and damaged,and large deformation of the clay core wall can occur without a proportional increase in contact pressure.The test results also demonstrate that overburden pressure has a significant influence on the pene-tration behavior.As the overburden pressure increases from 100 to 500 kPa,the overall bearing stiffness of the clay core wall increases markedly.This pressure-dependent behavior reflects the compaction effect and pressure-harden-ing characteristics of clay under higher vertical stress conditions.The proposed hyperbolic normal contact model ef-fectively describes the measured relationship between wall-end pressure and penetration displacement.The coeffi-cient of determination of the model fitting reaches 0.936 9,indicating good agreement between the fitted curves and the experimental data.The finite element results obtained using the proposed nonlinear normal contact model are generally consistent with the model test results,further confirming the rationality and effectiveness of the proposed contact model.[Conclusions]The penetration of a cut-off wall into a clay core wall is governed by a strongly non-linear normal contact mechanism,rather than a simple linear pressure-displacement relationship.The wall-end re-sistance develops rapidly at the initial stage and then gradually approaches a slower growth trend as soil disturbance and local structural damage progress.Overburden pressure is a key controlling factor in this process,because higher vertical pressure enhances the compactness,stiffness,and resistance capacity of the clay core wall.The hyperbolic nonlinear normal contact model proposed in this study provides an effective mathematical representation of the wall-end pressure-penetration displacement relationship and can reasonably reflect the pressure-dependent deformation characteristics of clay.Its successful application in finite element analysis indicates that the model can serve as a re-liable theoretical and numerical tool for analyzing the interaction between cut-off walls and clay core walls.
华新春;陈能成;丁少林;徐晗;王艳丽;赵旭东;潘家军
长江勘测规划设计研究有限责任公司上海分公司,上海 200000长江勘测规划设计研究有限责任公司上海分公司,上海 200000长江科学院水利部岩土力学与工程重点实验室,武汉 430010长江科学院水利部岩土力学与工程重点实验室,武汉 430010长江科学院水利部岩土力学与工程重点实验室,武汉 430010长江科学院水利部岩土力学与工程重点实验室,武汉 430010长江科学院水利部岩土力学与工程重点实验室,武汉 430010
建筑与水利
防渗墙黏土心墙法向接触模型模型试验上覆压力
anti-seepage wallclay core wallnormal contact modelmodel testoverburden pressure
《长江科学院院报》 2026 (8)
149-158,10
国家重点研发计划项目(2023YFC3209504)国家重点基金项目(U21A20158)中央级公益性科研院所基本科研业务费项目(CKSF2025718/YT,CKSF20241024/YT,CKSF2025190/YT)武汉市自然科学基金项目(晨光计划)(2024040801020271)
评论