大型灌区长距离引水工程充水试验研究及成果分析OA

Research and Result Analysis of Water Filling Test for Long-Distance Diversion Projects in Large Irrigation Area

中文摘要英文摘要

为全面检验工程实体、外观质量及渠道输水能力和设备性能,对工程全线进行了充水试验和联动试验,①完成充水段渠道冲洗及充水试验工作,保证下一步供水水质;②完成动水试验工作,检验渠道输水能力和设备性能,供水管道及建筑物达到安全、规范、经济运行,确保工程运行安全;③掌握渠道运行规律,初步建立渠道运行各项参数数据库,为后期管理积累经验;④查找工程充水试验过程中存在的问题并进行处理完善,为工程运行奠定基础,保证明渠、隧洞、渡槽、倒虹吸及连接段等建筑物安全运行.

To comprehensively verify the physical quality,appearance quality,water conveyance capacity of channels,and equipment performance of the project,water filling tests and joint commissioning tests were carried out along the entire project line.Firstly,channel flushing and water filling tests were completed for the water-filled sections to ensure water quality for subsequent water supply.Secondly,running water tests were conducted to verify the channel conveyance capacity and equipment performance,ensuring safe,standardized,and economical operation of water supply pipelines and structures,and guaranteeing operational safety of the project.Thirdly,the operational laws of channels were mastered,and a preliminary database of channel operation parameters was established to accumulate experience for later-stage management.Fourthly,problems identified during the water filling tests were addressed and rectified,laying a solid foundation for project operation and ensuring the safe operation of open channels,tunnels,aqueducts,inverted siphons,and connecting structures.

谢志国

云南省滇中引水工程建设管理局,云南 昆明 650000

建筑与水利

长距离大型灌区引水工程充水试验

long distancelarge scale irrigation areawater diversion projectwater filling test

《云南水力发电》 2026 (8)

24-29,6

10.3969/j.issn.1006-3951.2026.08.006