首页|期刊导航|广西水利水电|合面狮水力发电厂坝后引水管加固方案分析

合面狮水力发电厂坝后引水管加固方案分析OA

Analysis of reinforcement scheme for the downstream penstock of Hemianshi Hydropower Plant

中文摘要英文摘要

合面狮水力发电厂引水管运行多年后发生开裂、渗水等问题,经化学灌浆处理后依然渗水.经观测和验算后认为温度应力是造成引水管混凝土开裂的主要原因,裂缝形式以纵向(顺水流向)裂缝居多,横向裂缝较少,裂缝表面有大量白色钙化物析出现象,存在安全风险,影响电站的安全运行.因此,尽快对引水管采取加固措施是十分必要的.选择引水管内衬钢板和拆除重建两个方案进行比选,最终选定拆除重建方案.

After many years of operation,the diversion penstock of Hemianshi Hydropower Plant experienced crack-ing and water seepage.Although chemical grouting treatment was carried out,the seepage continued.Based on field observation and computational verification,temperature stress was identified as the principal causes responsible for the penstock concrete cracking.The cracks were mostly longitudinal(in the direction of water flow),with transverse cracks being relatively infrequent,and a large amount of white calcium precipitate was found on the crack surfaces,indicating safety risks and affecting the safe operation of the power plant.Therefore,urgent reinforcement of the pen-stock is necessary.Two options were compared,namely installing an internal steel liner versus demolishing and re-building the penstock,and the demolition and reconstruction option was ultimately chosen.

覃翠虹;黄华丹

广西水利电力勘测设计研究院有限责任公司,南宁 530023广西水利电力勘测设计研究院有限责任公司,南宁 530023

建筑与水利

引水管开裂内衬钢管化学灌浆温度应力合面狮水电站

diversion penstockcrackinner lining steel pipechemical groutingtemperature stressHemianshi Hy-dropower Plant

《广西水利水电》 2026 (4)

94-97,4

评论