古能明渠渠道变更修复方案优化设计OA
Optimization design of change and rehabilitation scheme for Guneng open channel
大流量明渠因施工征地受阻而长时间泡水,后遭遇连续强降雨发生边坡滑塌,在此情况下,为保障工程顺利通水,明渠变更修复方案有必要同时考虑滑坡和征地两大因素.以乐滩水库灌区工程古能明渠边坡滑塌问题为例,提出多种变更修复方案,经技术和经济比选后,确定单孔拱形混凝土暗涵方案,该方案较为彻底地治理了滑坡体,也解决了遗留多年的征地难题.
Due to obstruction in construction land acquisition,the large-flow open channel was submerged for an ex-tended period,and subsequently suffered slope collapse under continuous heavy rainfall.Under this situation,to en-sure the smooth water delivery of the project,it is necessary to consider both the landslide and the land acquisition issues when formulating the change and rehabilitation scheme for the open channel.Taking the landslide issue of Guneng open channel in Letan Reservoir Irrigation Zone as an example,multiple change and rehabilitation schemes were proposed,and after a technical and economic comparison,the single arch-shaped concrete buried culvert scheme was determined.This scheme not only thoroughly treated the landslide mass but also solved the long-stand-ing land acquisition issue.
贺香兰;龙起华
广西水利电力勘测设计研究院有限责任公司,南宁 530023广西水利电力勘测设计研究院有限责任公司,南宁 530023
天文与地球科学
渠道滑坡征地方案比选乐滩水库灌区
channellandslideland acquisitioncomparison and selection of schemesLetan Reservoir Irrigation Zone
《广西水利水电》 2026 (4)
84-87,4