玉林市龙云灌区蟠龙水库二期导流设计OA
Phase Ⅱ diversion design for the Panlong Reservoir in Longyun Irrigation Zone of Yulin City
施工导流围堰通过挡水、导流、防护等综合作用,将水下施工转化为干地或可控水位施工,是保障主体工程安全、质量和进度的关键临时设施.以蟠龙水库二期围堰工程为例,论述了设计过程中综合考虑水文地质条件、工程规模、施工周期及后期拆除的可行性,最终实现"临时挡水、服务主体、安全可靠、节省投资"的目标.
The construction diversion cofferdam,through its comprehensive roles in retaining water,diverting flow,and providing flood protection,enables construction that would otherwise be underwater to be carried out in dry con-ditions or under controlled water levels.It is therefore an essential temporary facility for ensuring the safety,quality,and progress of the main works.Taking the Phase II cofferdam of the Panlong Reservoir as an example,this paper demonstrates that through comprehensive evaluation of hydrogeological conditions,project scale,construction schedule,and feasibility of future demolition,the design successfully achieved the objectives of providing temporary water retention while ensuring safety and reliability,supporting the main project,and minimizing the costs.
韦广龙;黄静云
广西水利电力勘测设计研究院有限责任公司,南宁 530023广西水利电力勘测设计研究院有限责任公司,南宁 530023
建筑与水利
施工导流土石围堰施工顺序技术要求龙云灌区
construction diversionearth-rock cofferdamconstruction sequencetechnical requirementsLongyun Irrigation Zone
《广西水利水电》 2026 (4)
77-80,4