顶管工程工作井的结构优化设计及稳定性分析OA
Structural optimization design and stability analysis of the working shaft in pipe-jacking engineering
本文以蟠龙-中甘岭引水渠蟠龙顶管项目为背景,基于三维有限元模型,对顶管工程工作井的结构进行了优化设计,通过数值分析,对顶管工作井结构和周边土体的空间力学特性及变形规律展开分析.将工作井在开挖和横向顶进中的力学行为与变形特性作为研究焦点.基于正交试验设计,系统探究连续墙与内衬墙厚度、底板尺寸及土体刚度等核心参数,获得这些参数间的相互作用关系,通过量化比较得到工作井结构最优设计方案.通过有限元模型分析开挖阶段及顶进阶段的稳定性,得到周围土体模量对工作井位移的影响规律,为减小工作井位移提供了依据.
Taking the Panlong pipe-jacking project,which is a part of the Panlong-Zhongganling water diversion channel,as the engineering background,this paper presents a structural optimization design of the working shaft in pipe-jacking engineering based on a three-dimensional finite element model.Numerical analysis was employed to analyze the spatial mechanical characteristics and deformation patterns of the pipe-jacking working shaft structure and the surrounding soil mass,focusing on the mechanical behavior and deformation characteristics of the working shaft during excavation and lateral jacking.Based on orthogonal experimental design,the key parameters such as the thickness of the diaphragm wall and inner lining wall,base slab dimensions,and soil stiffness were systematical-ly examined to identify the interaction relationship among these parameters,and the optimal structural design of the working shaft was determined through quantitative comparison.Finite element modeling was employed to analyze the stability throughout the excavation and jacking stages,and the influence of the surrounding soil modulus on working shaft displacement was identified,providing a basis for reducing the displacement.
唐翔;郭业水
广西水利电力勘测设计研究院有限责任公司,南宁 530023广西水利电力勘测设计研究院有限责任公司,南宁 530023
建筑与水利
顶管工程工作井结构优化设计稳定性三维有限元模型龙云灌区
pipe-jacking engineeringstructure of working shaftoptimization designstabilitythree-dimensional fi-nite element modelLongyun Irrigation Zone
《广西水利水电》 2026 (4)
72-76,5
评论