Optimization of the location and axis of the underground powerhouse for Yulin Pumped-Storage Power Station
地下厂房的位置及轴线选择是抽水蓄能电站重点关注的技术方案,主厂房纵轴线方位的选择,在满足引水发电系统布置较为顺畅的前提下,与岩体主要结构面走向呈较大夹角,在以构造应力为主的高地应力区与最大主应力方位呈较小夹角.玉林抽水蓄能电站采用一洞四机设计,引水岔管为钢筋混凝土岔管,高压岔管和主洞室对地质条件要求严格.通过三大专题咨询,在可研评审意见的指导下,本文根据已有类似工程经验,提出了可能继续优化的思路,补充了大量的补勘工作,根据新揭露的地质条件和地应力,在不影响原征地范围的前提下,从轴线布置、水工建筑布置、施工组织、可比投资等多方面进行深度比选,实现优中选优.
The location and axis selection of the underground powerhouse are critical technical aspects of pumped-storage power stations.The longitudinal axis orientation of the main powerhouse should ensure a smooth layout of the water diversion and power generation system,form a large angle with the strike of major rock structural planes,and in high-ground stress areas dominated by tectonic stress,form a small angle with the maximum principal stress direction.The Yulin Pumped-Storage Power Station is designed with a single tunnel supplying four turbine units,and the diversion bifurcated pipes are constructed with reinforced concrete.The high-pressure bifurcated pipes and the main powerhouse cavern have strict requirements on the geological conditions.The project has passed the con-sultation on the three major special topics.Under the guidance of the review comments on the feasibility study re-port,and with reference to the existing experience from similar projects,the ideas for further potential optimization were puts forward.A large amount of supplementary survey work was carried out.Based on the newly revealed geo-logical conditions and ground stress,while not affecting the original land acquisition scope,a detailed comparison and selection was conducted from multiple aspects such as axis layout,hydraulic building layout,construction orga-nization,and comparable investment,to achieve the best choice from the best options.
马加顺;黄学铭;龙裕芳
南方电网储能股份有限公司玉林蓄能发电有限公司,广西 玉林 537000南方电网储能股份有限公司玉林蓄能发电有限公司,广西 玉林 537000南方电网储能股份有限公司玉林蓄能发电有限公司,广西 玉林 537000
建筑与水利
地下厂房补充勘察地应力玫瑰图轴线优化施工组织可比投资玉林抽水蓄能电站
underground powerhousesupplementary surveyground stressrose diagramaxis optimizationcon-struction organizationcomparable investmentYulin Pumped-Storage Power Station