首页|期刊导航|高电压技术|考虑多因素影响的变压器分区管理与运维检修业务决策方法

考虑多因素影响的变压器分区管理与运维检修业务决策方法OA

Partition Management,Operation and Maintenance Business Decision-making Method for Power Transformer Considering the Influence of Multiple Factors

中文摘要英文摘要

作为电网核心枢纽设备,变压器呈现结构复杂、地理位置分散且地域分布跨度大等特点,导致设备运维检修工作耗时耗力.针对当前变压器运维检修业务缺乏完善管理及决策机制的问题,提出了一种考虑多因素影响的变压器分区管理与差异化运维检修规划方法,以提升设备管理与决策的科学化及智能化水平,降低设备运维检修成本.首先,提出了考虑设备分布情况、电压等级和运检中心承载能力等静态因素的变压器分区管理方法,实现了多运检中心模式下的设备管理及各运检中心的规划选址.其次,综合设备健康状态、运维检修时限要求及运维人员承载力等动态因素,构建了面向变压器差异化检修需求的两阶段优化模型.然后,提出了基于Dijkstra算法路径引导机制的改进多目标差分进化算法,实现了设备运维检修业务的规划决策.最后,以某地区电网为对象,开展实例分析,验证了该方法的实用性和有效性.

As the core equipment of the power grid,the transformer presents the characteristics such as complex structure,dispersed geographical location and wide geographical distribution,which leads to the time-consuming and la-bor-intensive operation and maintenance of the equipment.Aiming at the problem of inadequate management and decision-making mechanism in operation and maintenance business of substation equipment,we put forward a method for the partition management and differentiated operation and maintenance decision of substation equipment considering the influence of multiple factors,so as to enhance the scientific and intelligent level of equipment management and deci-sion-making,and reduce operational and maintenance costs.Firstly,a partition management method of substation equipment considering static factors such as equipment distribution,voltage level and carrying capacity of maintenance center is proposed,which realizes equipment management and the planning and site selection of each center under mul-ti-operation and maintenance center mode.Secondly,a two-stage optimization model is constructed to address the differentiated maintenance requirements of substation equipment,incorporating dynamic factors such as equipment health status,operation and maintenance time constraints,and personnel carrying capacity.Then,an improved multi-objective differential evolution algorithm based on the path guidance mechanism of the Dijkstra algorithm is proposed,achieving the scheme decision-making for equipment operation and maintenance business.Finally,a case study of a regional power grid is carried out,and the practicability and efficiency of the proposed method in the paper are verified.

廖才波;龚文豪;邵剑;蒋子豪;谢嘉宏;李金波

南昌大学能源与电气工程系,南昌 330031南昌大学能源与电气工程系,南昌 330031国网江苏省电力有限公司电力科学研究院,南京 211103南昌大学能源与电气工程系,南昌 330031南昌大学能源与电气工程系,南昌 330031南昌大学能源与电气工程系,南昌 330031

变压器检修决策差异化检修两阶段优化模型多目标差分进化算法

transformermaintenance decisiondifferentiated maintenancetwo-stage optimization modelmul-ti-objective differential evolution algorithm(MODE)

《高电压技术》 2026 (7)

3327-3337,中插20,12

国家自然科学基金(52367001)国家电网有限公司科技项目(5700-202455338A-2-1-ZX).Project supported by National Natural Science Foundation of China(52367001),Science and Technology Project of SGCC(5700-202455338A-2-1-ZX).

10.13336/j.1003-6520.hve.20250829

评论