Research on Calculation Method of Proportional Coefficient m of Foundation Coefficient
[目的]"m 法"是我国铁路、公路和建筑等行业规范计算分析桩基内力和变形的最常用方法.目前,相关规范仅提供了参数 m 的取值范围,设计时具体取值凭经验选择,受主观影响导致取值差异很大.而迄今很少有关于 m 值的理论分析与计算方法研究.[方法]为研究 m 值的理论计算方法,基于桩侧水平土抗力的"m 法"力学原理与考虑位移影响的被动土压力模型,建立可以利用抗剪强度参数和变形直接计算 m 值的理论公式,给出该计算方法的详细计算步骤和流程,编写计算程序实现快速计算.通过金甬铁路鄞奉特大桥和厦深铁路长沙湾特大桥单桩水平静载试验的工程案例,对所建立的 m 值理论计算公式进行验证分析.[结果]结果表明:本文推导的理论公式计算得到金甬铁路鄞奉特大桥工程项目的 m 值为 6 580.63 kN/m4,与现场实测值 6 416 kN/m4 很接近,相对误差仅有0.59%;得到厦深铁路长沙湾特大桥工程项目的m 值为 4 090.60 kN/m4,在现场实测值 3 880~5 620 kN/m4 范围内,且取值较为安全.[结论]提出的 m 值计算方法能够较好地预估水平受荷桩主要影响范围内土层的 m 值.
[Objective]The m-method is the most commonly used method for calculating and analyzing the internal force and deformation of pile foundations in China's railway,highway,and construction industries.At present,the relevant specifications only provide the range of the parameter m,and the specific value in design is selected based on experience,which is subjective and leads to large variations in the m-value.However,there are few studies on the theoretical analysis and calculation method of the m-value.[Methods]To investigate the theoretical calculation method of the m-value,based on the mechanical principle of the m-method for lateral soil resistance and the passive earth pressure model considering displacement,a theoretical formula that could directly calculate the m-value using shear strength parameters and deformation was established.The detailed calculation steps and procedure of the method were provided,and a calculation program was developed to achieve rapid calculation.The proposed theoretical formula for the m-value was verified and analyzed using the engineering cases of single-pile horizontal static load tests on the Yinfeng Grand Bridge of the Jinyong Railway and the Changshawan Grand Bridge of the Xiamen-Shenzhen railway.[Results]The results showed that the m-value of the Yinfeng Grand Bridge project on the Jinyong railway,calculated by the theoretical formula derived in this study,was 6 580.63 kN/m4,which was very close to the measured value 6 416 kN/m4,with a relative error of only 0.59%.The m-value obtained for the Changshawan Grand Bridge project on the Xiamen-Shenzhen railway was 4 090.60 kN/m4,which was within the range of measured on-site values(3 880~5 620 kN/m4)and was relatively conservative.[Conclusion]The proposed calculation method for the m-value can well predict the m-value of soil within the main influence range of horizontally loaded piles.
史钦华;邓煜晨;冷伍明;杨奇;何阳铭
中国铁路上海局集团有限公司杭州铁路枢纽工程建设指挥部,杭州 200071中南大学土木工程学院,长沙 410075中南大学土木工程学院,长沙 410075中南大学土木工程学院,长沙 410075中国铁路上海局集团有限公司杭州铁路枢纽工程建设指挥部,杭州 200071
交通工程
桥梁桩基地基系数的比例系数(m值)朗肯被动土压力抗剪强度参数容许水平位移
bridge pile foundationsproportional coefficient of foundation coefficient(m-value)Rankine passive earth pressureshear strength parametersallowable horizontal displacement