首页|期刊导航|水力发电|计及网络拓扑灵活性的区域水电系统多电网协同优化方法

计及网络拓扑灵活性的区域水电系统多电网协同优化方法OA

Multi-Grid Coordinated Optimization Method for Regional Hydropower Systems Considering Network Topology Flexibility

中文摘要英文摘要

在中国独特的电力结构中,部分区域电网运营于异步运行的国家电网和南方电网的交界地带.尽管这些地方电网地理位置优越,但受制于内部输电阻塞和复杂的水力耦合特性,难以充分利用两大电网间的跨电网价差.为解决上述问题,本文面向地方水电系统提出一种日前协同优化框架,实现发电计划、多电网交易组合与网络拓扑结构的同步优化.该框架集成了基于增广灵敏度因子的线路筛选方法以及自适应 McCormick 包络线性化技术.案例仿真结果表明,通过主动重构网络 拓 扑,所提框架显著提升了运行经济性和物理效率:在丰水期使售电收益提升2.89%,在枯水期使购电成本降低 1.95%.结果证实该框架能够为地方水电系统提供计算高效且实用性强的决策支持方案.

In China's unique power grid structure,there exist regional grids operating in the border zones between the asynchronously operated State Grid and China Southern Grid.Despite their advantageous geographical location,these local grids are unable to fully utilize the inter-grid price spreads between the two major grids due to internal transmission congestion and complex hydraulic coupling.To address these challenges,this paper proposes a day-ahead coordinated optimization framework for local hydropower systems,which simultaneously optimizes generation schedules,multi-grid trading portfolios,and network topology.The framework integrates a line-screening method based on augmented sensitivity factors and an adaptive McCormick envelope linearization approach.Case simulations demonstrate that,through proactive network topology reconfiguration,the proposed framework significantly improves operational economy and physical efficiency:increasing electricity sales revenue by 2.89%during the wet season and reducing electricity purchase costs by 1.95%during the dry season.The results confirm that this framework can provide a computationally efficient and practically viable decision-support solution for local hydropower systems.

张州;程雄;曾晓涛;孙静雯

三峡大学电气与新能源学院,湖北 宜昌 443002梯级水电及新能源运行与控制湖北省重点实验室(三峡大学),湖北 宜昌 443002||三峡大学水利与环境学院,湖北 宜昌 443002三峡大学电气与新能源学院,湖北 宜昌 443002三峡大学水利与环境学院,湖北 宜昌 443002

信息技术与安全科学

梯级水电站区域水电系统多电网交易最优传输切换线性化方法

cascade hydropower stationregional hydropower systemmulti-grid tradingoptimal transmission switchinglinearization method

《水力发电》 2026 (7)

57-68,12