铁路电力线路迁改关键技术研究OA
在铁路电力线路迁改工程中,高压电力线路杆塔组立施工技术发挥着核心支撑作用,通过标准化杆塔设计与模块化施工模式的深度融合,显著提升工程安全水平与施工效率.该技术针对跨铁路带电作业这一行业难题,创新采用非接触式安装工艺,有效规避传统施工对铁路运营的干扰,同时确保电网供电的持续稳定.在生态保护方面,通过预制构件与精准定位技术,大幅减少现场作业面积与土方开挖量,实现对周边环境的低扰动.这一技术体系充分体现现代基础设施建设的精细化理念,其成功应用不仅为交通强国战略提供关键技术支撑,推动铁路网络与电力系统的协同升级,更为城市群互联互通创造有利条件.通过技术驱动实现基础设施迭代升级,该案例彰显创新施工方法在平衡工程需求、安全标准与生态保护方面的综合价值,为复杂环境下的电力迁改工程树立示范标杆.
In the railway power line relocation project,the construction technology of high-voltage power line tower assembly plays a core supporting role.Through the deep integration of standardized tower design and modular construction mode,the safety level and construction efficiency of the project have been significantly improved.This technology addresses the industry challenge of cross railway live working by innovatively adopting non-contact installation technology,effectively avoiding the interference of traditional construction on railway operations,while ensuring the continuous and stable power supply of the power grid.In terms of ecological protection,by using prefabricated components and precise positioning technology,the on-site operation area and excavation volume have been significantly reduced,achieving low disturbance to the surrounding environment.This technological system fully embodies the refined concept of modern infrastructure construction.Its successful application not only provides key technical support for the strategy of building a strong transportation country,promotes the coordinated upgrading of railway networks and power systems,but also creates favorable conditions for the interconnection and intercommunication of urban agglomerations.By driving infrastructure iteration and upgrading through technology,this case demonstrates the comprehensive value of innovative construction methods in balancing engineering requirements,safety standards,and ecological protection,and sets a demonstration benchmark for power relocation projects in complex environments.
庞现刚
安徽省综合交通研究院股份有限公司,合肥 230051
信息技术与安全科学
铁路高压电力线路迁改杆塔组立施工关键技术
railwayhigh voltagepower line relocation and reconstructiontower assembly and constructionkey technologies
《科技创新与应用》 2026 (17)
187-190,4
评论