新型能源体系下电网基建清障补偿前期管控OA
Preliminary Management of Compensation for Power Grid Infrastructure Clearance Under New Energy System
针对内蒙古电网建设前期清障青赔工作中,项目规划与国土空间规划不匹配、跨区域建设权责边界模糊、各地征地补偿标准不统一、施工前期群众突击抢栽抢建、政企信息不对称、文明施工管控缺失等不足,造成工程协调阻力大、建设进度滞后的问题,结合大量输变电工程现场实践,提出坚持规划合规前置、构建政企联动责任机制、事前发布公告留存影像资料、一线踏勘摸清地物民情、分类分级疏导民事矛盾、优化塔位路径方案、统一补偿标准并规范兑付流程、推行文明施工、开展项目后评价与动态监测的全流程管理方案.在呼张电气化铁路、化德—四子王旗220 kV新能源汇集供电等工程中采用以上方案后,有效遏制了抢建乱象,妥善化解了各类征地纠纷,保障了项目按期建成投产.
In response to a series of issues encountered during the preliminary land clearance and compensation work for the Inner Mongolia power grid construction,including mismatches between project planning and territorial spatial planning,unclear boundaries of authority and responsibility for cross-regional construction,inconsistent land acquisition compensation standards across regions,last-minute planting and construction by local residents prior to construction,information asymmetry between government and enterprises,and a lack of oversight for civilized construction practices,which have resulted in significant coordination challenges and delays in construction progress,drawing on extensive field experience in power transmission and transformation projects,this paper proposes the following measures of prioritizing planning compliance,establishing a collaborative responsibility mechanism between government and enterprises,issuing advance public notices and retaining visual documentation,conducting on-site surveys to assess land features and local conditions,addressing civil disputes through categorized and tiered mediation,optimizing tower site and route plans,standardizing compensation criteria and streamlining payment procedures,promoting civilized construction practices,and implementing post-project evaluations and dynamic monitoring.After implementing these measures in projects such as the electrified railway from Hohhot to Zhangjiakou and the Huade-Siziwang Banner 220 kV new energy aggregation power supply project,the practice of unauthorized construction is effectively curbed,various land acquisition disputes are properly resolved,and the projects are completed and put into operation on schedule.
朱永贵
内蒙古自治区电力行业协会,呼和浩特 010020
信息技术与安全科学
电网建设新型能源体系清障青赔
power grid constructionnew energy systembarrier clearance and crop compensation
《内蒙古电力技术》 2026 (3)
98-100,3