首页|期刊导航|建筑设计管理|在多业态综合体项目中推行设计总包的意义和作用

在多业态综合体项目中推行设计总包的意义和作用OA

The Significance and Role of Implementing Integrated Design Contracting in Mixed-Use Complex Projects:A Case Study of the Changsha Minmetals Plaza Project

中文摘要英文摘要

本文从开发企业视角,探讨多业态综合体中设计总包管理模式的应用与实践.文章以长沙五矿广场项目为例,分析其多业态复杂性及传统设计管理面临的挑战;阐述设计总包所需核心能力、权责分工与跨专业协同机制;创新提出"效果总包+设计总包"双轨架构,为同类项目提供实践参考.

From the perspective of a real estate developer,this paper explores the application and practice of the integrated design contracting management model in mixed-use complexes.Using the Changsha Minmetals Plaza project as a case study,it analyzes the complexities of multi-format projects and the challenges faced by traditional design management.It elaborates on the core competencies required for integrated design contracting,the delineation of roles and responsibilities,and the mechanisms for cross-disciplinary collaboration.Innovatively,it proposes a dual-track management framework combining"effect delivery contracting"and"integrated design contracting",providing a practical reference for similar projects.

常婷;刘波;王久生;王兆雄

五矿地产有限公司,北京 100010五矿地产有限公司,北京 100010五矿地产有限公司,北京 100010五矿地产有限公司,北京 100010

建筑与水利

设计总包多业态综合体协同设计BIM技术效果总包

integrated design contractingmixed-use complexcollaborative designBIM technologyeffect delivery contracting

《建筑设计管理》 2026 (4)

17-33,17

10.3969/j.issn.1673-1093.2026.04.002

评论