首页|期刊导航|河南水利与南水北调|碾压混凝土大坝工程施工质量管理分析

碾压混凝土大坝工程施工质量管理分析OA

Analysis on Quality Management in the Construction of Roller Compacted Concrete Dams

中文摘要英文摘要

文章结合实际工程情况,围绕水库碾压混凝土大坝工程施工质量管理策略展开探讨,系统梳理工程基本信息与建设目标难点,深入剖析施工中裂缝、骨料分离、层间结合不良三类核心质量问题的表现与成因,从原材料控制、施工工艺优化、过程监测检测三方面提出针对性管理措施,结合芯样检测图与成本效益表验证管理成效.研究表明,科学的质量管理体系可有效保障大坝施工质量,旨在为同类水利工程提供实践参考.

Based on the actual engineering conditions,this paper discusses the quality management strategies for the construction of roller compacted concrete dams in reservoir projects,systematically sorts out the basic engineering information and key construction objectives and difficulties,deeply analyzes the manifestations and causes of three core quality problems in construction,namely cracks,aggregate separation and poor interlayer bonding,and proposes targeted management measures from three aspects:raw materials control,construction process optimization,and process monitoring and testing.The management effectiveness is verified through core sample test charts and cost-benefit tables.The research shows that a scientific quality management system can effectively ensure the construction quality of the dam,aiming to provide practical references for similar water conservancy projects.

李玉杰;高茜

济源水利建设投资有限责任公司,河南 济源 459000济源水利建设投资有限责任公司,河南 济源 459000

建筑与水利

碾压混凝土大坝施工质量管理原材料控制工艺优化

roller compacted concrete dammanagement of construction qualitycontrol of raw materialsoptimization of technologies

《河南水利与南水北调》 2026 (5)

59-60,2