广西郁江洪水调度方案研究OA
Research on flood control operation plan for Yujiang River in Guangxi
在珠江洪水调度方案的总体框架下,结合郁江流域防洪体系建设现状及流域防洪要求,分析了郁江流域洪水特性,在对主要防洪控制断面设计洪水复核的基础上,补充分析了不同频率地区洪水组成及演进规律;梳理了流域防洪体系建设情况及薄弱环节,分析河段防洪调度风险,并对现有洪水调度方案进行评估.在此基础上,根据流域洪水特性及防洪要求,按全流域、左右江等不同洪水来源和不同频率洪水进行流域洪水调度方案研究,拟定了防洪调度原则和调度方案,分析了调度结果,并提出洪水资源化利用方案,为流域洪水调度提供相应的技术支撑.
Under the overall framework of the Pearl River flood operation plan,combined with the current status of the flood control system construction in the Yujiang River basin as well as the flood control requirements of the ba-sin,the flood characteristics of Yujiang River Basin were analyzed.Based on the recheck of the design floods at the main flood control sections,supplementary analysis was conducted on the composition and evolution patterns of re-gional floods with different return periods.The situation and weak links of the flood control system construction in the basin were sorted out,the flood control scheduling risks in the river sections were analyzed,and the existing flood control operation plan was evaluated.On this basis,according to the flood characteristics and flood control re-quirements of the basin,a research is conducted on the flood operation plan considering different flood sources such as the entire basin,the Zuojiang River and Youjiang River as well as floods of different return periods.The flood control scheduling principles and operation plan are formulated,the scheduling results are analyzed,and a flood re-source utilization scheme is proposed,providing corresponding technical support for the flood control scheduling in the basin.
张大鹏
广西水利电力勘测设计研究院有限责任公司,南宁 530023
建筑与水利
洪水特性分析防洪目标要求调度方案郁江流域
analysis of flood characteristicsflood control objectivesoperation planYujiang River Basin
《广西水利水电》 2026 (3)
103-106,129,5