60 m级深厚覆盖层河床导截流关键技术OA

Key technologies for river diversion and closure on riverbeds with 60m-thick deep overburden

中文摘要英文摘要

以大渡河流域深厚覆盖层上的金川水电站为研究对象,在充分借鉴以往工程截流经验的基础上,通过理论分析、模型试验和数值模拟相结合的方法,研究采取导流洞闸门局开控泄替代临时供水洞保证下游生态流量的可行性,以及导流工程设计施工关键技术问题和深厚覆盖层河床截流涉及的截流时段与流量选择、导流准备与过流能力、截流方式、戗堤与龙口选择、截流备料与资源准备、戗堤预进占施工、龙口段(截流)施工、闭气料施工等关键技术问题.该深厚覆盖层河床导截流的成功经验可为类似水电工程导截流设计和施工提供借鉴.

Taking the Jinchuan Hydropower Station,which is situated on a deep overburden in the Dadu River basin,as the research object,and based on a full reference to the river closure experience from previous projects,a combi-nation of theoretical analysis,model testing,and numerical simulation was employed to study the feasibility of using partially opened diversion tunnel gates for discharge control in place of temporary water supply tunnels to maintain downstream ecological flow.Additionally,this study examined the critical technologies related to the design and construction of diversion works and the key technical considerations for river closure on riverbeds with deep over-burden,including the determination of closure timing and flow rates,preparation of diversion and flow capacity,se-lection of closure methods,closure cofferdam and gap configuration,material and resource preparation for closure,pre-advance construction of the closure cofferdam,construction of closure gap section,and the placement of sealing materials.

覃事河;段斌;薛守宁;李志;严思源

国能大渡河金川水电建设有限公司,四川 阿坝 624100国能大渡河流域水电开发有限公司,成都 610000国能大渡河金川水电建设有限公司,四川 阿坝 624100中国水利水电第七工程局有限公司,成都 610213国能大渡河金川水电建设有限公司,四川 阿坝 624100

建筑与水利

60m级深厚覆盖层导流截流关键技术生态流量

60m-thick deep overburdenriver diversionriver closurekey technologiesecological flow

《广西水利水电》 2026 (3)

56-60,64,6