威后水电站拦河坝为碾压混凝土拱坝,水库总库容1.33 亿m3,最大坝高77 m,总装机容量32 MW.介绍了坝体应力与抗滑稳定分析结果和泄洪及消能建筑物的设计布置,并通过水工模型试验验证设计成果.通过三维仿真计算、水工模型试验研究,解决了工程设计的关键技术问题.
The dam of Weihou Hydropower Station is a roller compacted concrete arch dam.The total storage capaci-ty of reservoir is 1.33×108 m3,the maximum dam height is 77m,and the total installed capacity is 32 MW.The anal-ysis results of the stress and anti-sliding stability of the dam body,as well as the design layout of the flood discharge and energy dissipating structures,are introduced.The design results are verified through hydraulic model tests.Through three-dimensional simulation calculations and hydraulic model experiments,the key technical problems in engineering design are solved.
廖小燕
广西业恒建设有限公司,南宁 530007
建筑与水利
碾压混凝土拱坝泄洪建筑物消能防冲设施威后水电站
roller compacted concrete(RCC)arch damflood discharge structureenergy dissipating and anti-scour facilitiesWeihou Hydropower Station