电力系统调度程控交换网部署的优化选择研究OA
Research on the Optimal Deployment of Program-controlled Switching Networks in Power System Dispatch
文章提出了一种针对电力调度程控交换网部署的优化选择方法.该方法旨在解决当前电力调度交换网设备配置过度依赖经验导致的组网架构不合理及设备配置匹配度不足的问题.总结提出了 3种不同的承载模式:传统模式、调度模式以及子网分区模式,并对每种模式在不同维度下进行对比.进一步详细阐述了基于选定承载模式的汇聚节点数量确定方法及设备配置.通过具体实施案例的分析,验证了所提方法的有效性和可行性.
The paper proposes an optimization selection method for the deployment of power dispatch program-controlled switching networks.This method aims to solve the problems of unreasonable network architecture and insufficient equipment configuration matching caused by excessive reliance on experience in the current power dispatching exchange network equipment configuration.Three different carrying modes were summarized and proposed:traditional mode,scheduling mode,and subnet partitioning mode,and each mode was compared in different dimensions.Further elaborated on the method of determining the number of aggregation nodes and device configuration based on the selected bearer mode.Finally,the effectiveness and feasibility of the proposed scheme were verified through the analysis of specific implementation cases.
黄际帆;李莉;张知宇;孙海波;王艳琦;刘婉妮;李逸飞
中国电力工程顾问集团华北电力设计院有限公司,北京市 西城区 100120国网冀北电力有限公司经济技术研究院,北京市 西城区 100038中国电力工程顾问集团华北电力设计院有限公司,北京市 西城区 100120国网冀北电力有限公司经济技术研究院,北京市 西城区 100038中国电力工程顾问集团华北电力设计院有限公司,北京市 西城区 100120中国电力工程顾问集团华北电力设计院有限公司,北京市 西城区 100120中国电力工程顾问集团华北电力设计院有限公司,北京市 西城区 100120
信息技术与安全科学
电力系统调度程控交换网承载模式汇聚节点
power systemdispatch program-controlled switching networksbearing modeaggregation node
《电力信息与通信技术》 2026 (6)
70-77,8
国网冀北电力有限公司科技项目"新型电力系统调度交换双模技术演进及广域多元协同应用研究"(52018F230001).
评论