首页|期刊导航|道路工程学报(英文)|Settlement characteristics and prediction of typical loess-filled subgrade considering constraint conditions

Settlement characteristics and prediction of typical loess-filled subgrade considering constraint conditionsOA

Settlement characteristics and prediction of typical loess-filled subgrade considering constraint conditions

Chenhui Guan;Zhe Li;Xiaoyan Liu;Lulu Liu;Wen Li;Guojun Cai

School of Civil Engineering,Wuhan University,Wuhan 430072,ChinaSchool of Highway,Chang'an University,Xi'an 710064,ChinaSchool of Mechanics and Civil Engineering,China University of Mining and Technology,Xuzhou 221116,ChinaSchool of Mechanics and Civil Engineering,China University of Mining and Technology,Xuzhou 221116,ChinaSchool of Highway,Chang'an University,Xi'an 710064,ChinaCollege of Civil Engineering,Anhui Jianzhu University,Hefei 230601,China

Loess subgradeSettlement characteristicSettlement predictionConstraint conditionDifferential settlement

Loess subgradeSettlement characteristicSettlement predictionConstraint conditionDifferential settlement

《道路工程学报(英文)》 2026 (2)

266-286,21

Authors are grateful for the financial and technical support provided by National Natural Science Foundation of China for Distinguished Young Scholars(Grant No.42225206),National Natural Science Foun-dation of China(Grant No.42577173,42477209,42302320,and Jiangsu Natural Science Foundation(BK20250207).

10.1016/j.jreng.2025.06.007

评论