双马一矿柔模沿空留巷围护技术研究与运用OA
Research and application of flexible formwork gob-side entry retaining enclosure technology in Shuangma No.1 Mine
[目的]针对柔模沿空留巷高机械化技术的应用需求,开展工程技术优化与实践研究,以提升巷道支护效果,保障工作面安全高效推进.[方法]以双马一矿沿空留巷工程为背景,系统开展了巷道支护结构优化、矿压显现特征研究,并对柔模施工工艺与配套装备进行了技术升级,形成了适应高强度开采条件的柔模沿空留巷成套围护技术方案.[结果]监测数据显示,沿空留巷实施150 m后,柔模墙体压力变化和围岩变形速率均趋于稳定,顶板下沉量最大 140 mm,两帮移近量小于30 mm.[结论]在巷旁支护与巷内加强支护协同作用下,留巷围岩变形得到有效控制,围岩稳定性显著提高.以期为类似地质条件下开展柔模沿空留巷技术提供有益见解.
In response to meet the application demands of high-mechanization technology for flexible formwork gob-side entry retaining,engineering technology optimization and practical research are carried out to improve roadway support effects and ensure safe and efficient advancement of the working face.Taking the gob-side entry retaining project at Shuangma No. 1 Mine as the background,systematic studies on roadway support structure optimization and mine pressure behavior characteristics were conducted.Technical upgrades were made to the flexible formwork construction process and supporting equipment,forming a complete set of surrounding rock control technology for flexible formwork gob-side entry retaining suitable for high-intensity mining conditions.Monitoring data show that after 150 m of gob-side entry retaining implementation,both the pressure variation of the flexible formwork wall and the deformation rate of the surrounding rock tend to stabilize.The maximum roof subsidence is 140 mm,and the convergence of the two sides is less than 30 mm.Under the synergistic effect of roadside support and in-roadway reinforced support,the deformation of the retained entry surrounding rock is effectively controlled,and the stability of the surrounding rock is significantly improved.
乔伟伟;张力新;曹新云;蒙作斌;范永慧
国家能源集团宁夏煤业有限公司双马一矿,宁夏 银川 750000国家能源集团宁夏煤业有限公司双马一矿,宁夏 银川 750000陕西开拓新矿业工程有限公司,陕西 西安 710054国家能源集团宁夏煤业有限公司双马一矿,宁夏 银川 750000陕西开拓新矿业工程有限公司,陕西 西安 710054
矿业与冶金
沿空留巷围护装备围岩控制围岩监测
gob-side entry retainingenclosure equipmentsurrounding rock controlsurrounding rock monitoring