首页|期刊导航|陕西煤炭|冲击地压矿井"地面双台阶L井压裂"+"井下定向长钻孔压裂"区域卸压技术研究

冲击地压矿井"地面双台阶L井压裂"+"井下定向长钻孔压裂"区域卸压技术研究OA

Pressure relief in the area of"surface double step L well fracturing"+"underground directional long borehole fracturing"in rock burst mine

中文摘要英文摘要

[目的]针对严重冲击地压矿井区域卸压问题,以孟村煤矿为例,该矿属于严重冲击地压矿井,401104工作面回风巷作为临空掘进巷道,反掘期间,采取常规防冲措施,工作面呈现微震事件频次高、能量大、冲击显现、底鼓量大、掘进单进水平低等特点.[方法]随后创新冲击地压防治方法,在 401103工作面煤层上方 60 m进行地面水平井压裂,裂缝东西方向扩展覆盖了整个 401103工作面,裂缝南北方向覆盖了 401103工作面及其北侧 401104工作面回风巷;待 401103工作面回采结束后,且在 401104回风巷掘进前在该面中部煤层上方 40 m区域实施了地面水平井分段压裂,再次对401104工作面回风巷煤层上方 40 m关键层进行了弱化;在井下,超前掘进工作面在 401104回风巷区段煤柱煤层上方 20 m区段实施定向长距离水力压裂进行预卸压,形成"高、中、低"三个关键层的弱化目的.[结果及结论]在 401104回风巷掘进过程中,卸压工程量降低 20%,集中应力降低15%,微震监测能量降低18%,单进提升130%,实现质效双提升.

In light of the regional pressure relief problem in severe rockburst mines,taking Mengcun Coal Mine as an example,which is a severe rockburst mine,the return airway of the 401104 working face is a gob-side driving roadway.During the reverse excavation phase,conventional rockburst prevention measures were adopted.The working face exhibited characteristics such as high-frequency microseismic events,large energy releases,rockburst manifestations,significant floor heave,and low single-advance excavation rates.Subsequently,an innovative rockburst control method was introduced.First,surface horizontal well fracturing was carried out 60 m above the coal seam of the 401103 working face.The fractures extended east-west,covering the entire 401103 working face,and north-south,covering both the 401103 working face and the return airway of the 401104 working face to the north.After mining of the 401103 working face was completed,and before excavation of the 401104 return airway,surface horizontal well staged fracturing was implemented 40 m above the coal seam in the middle of the 401104 working face,further weakening the key layer 40 m above the coal seam in the 401104 return airway.In the underground,directional long-distance hydraulic fracturing was carried out ahead of the excavation face in the coal pillar zone of the 401104 return airway,20 m above the coal seam,to achieve pre-pressure relief.Thus,the weakening of the three key layers—"high,medium,and low"—was accomplished.During the excavation of the 401104 return airway,the pressure relief workload was reduced by 20%,the concentrated stress decreased by 15%,the microseismic monitoring energy decreased by 18%,and the single-advance rate increased by 130%,achieving a dual improvement in quality and efficiency.

胡沛;李晶昆

陕西彬长孟村煤矿业有限公司,陕西 咸阳 712000陕西彬长孟村煤矿业有限公司,陕西 咸阳 712000

矿业与冶金

双台阶压裂地面水平井压裂冲击地压定向长钻孔水力压裂

double step fracturingsurface horizontal well fracturingrock burstdirectional long borehole hydraulic fracturing

《陕西煤炭》 2026 (7)

154-159,6

10.20120/j.cnki.issn.1671-749x.2026.0724

评论