拟建山区铁路穿越青藏高原西缘三大山系交汇带,该区域构造活动强烈、工程地质环境复杂,建设难度与风险极为突出.经剖析,沿线存在地形高差悬殊、气候极端恶劣、地震活跃、地质灾害频发等特征,铁路面临表生重大地质灾害、活动断裂与高地应力岩体变形等核心工程地质问题.结果表明:构建并实践的"空天地"一体化综合勘察技术体系,通过卫星遥感区域扫描、航空物探重点区精细探测、地面调查与钻探关键点验证的三步法,能显著提升重大不良地质识别精度与效率,精准查明不良地质分布、围岩特性与地应力条件,形成分级、分类的针对性工程对策.
The proposed mountain railway traversed the convergence zone of three major mountain ranges at the western margin of the Qinghai—Tibet Plateau,where tectonic activity was intense and the engineering geological environment was highly complex,resulting in exceptionally high construction difficulty and risk.Analysis revealed that the route was characterized by extreme topographic relief,harsh climatic conditions,frequent seismic activity,and recurrent geological hazards.The railway faced critical engineering geological challenges,including major surficial geological hazards,active faulting,and rock mass deformation under high in-situ stress.The results show that:an integrated"space-air-ground"survey system has been established and implemented.The accuracy and efficiency of identifying major adverse geological conditions have been significantly improved through a three-step methodology,i.e.regional scanning via satellite remote sensing,detailed airborne geophysical surveying over key areas,and ground-based field investigation and drilling for validation at critical points.This approach can significantly enhance precise delineation of the distribution of unfavorable geology,surrounding rock characteristics,and in-situ stress conditions,leading to graded and categorized engineering countermeasures.
于振涛;贾杰;于振江;任云
中铁二院工程集团有限责任公司,成都,610031||中铁二院劳模(专家)徐正宣地质创新工作室,成都 610031中铁二院工程集团有限责任公司,成都,610031||中铁二院劳模(专家)徐正宣地质创新工作室,成都 610031中铁二院劳模(专家)徐正宣地质创新工作室,成都 610031中铁二院工程集团有限责任公司,成都,610031||中铁二院劳模(专家)徐正宣地质创新工作室,成都 610031
交通工程
复杂艰险山区拟建铁路地质环境综合勘察关键技术风险分析对策措施
complex and hazardous mountainous regionsproposed railwaygeological environmentintegrated surveykey technologiesrisk analysiscountermeasures