首页|期刊导航|云南水力发电|基于糯扎渡监测数据的垫层热学参数反演及温度应力模拟

基于糯扎渡监测数据的垫层热学参数反演及温度应力模拟OA

Thermal Parameter Inversion and Temperature Stress Simulation of Cushion Layer Based on Nuozhadu Monitoring Data

中文摘要英文摘要

为深入研究糯扎渡混凝土垫层的温度场及应力场分布规律,根据垫层的温度监测资料,结合库水温度的计算、坝体基岩温度等情况,模拟混凝土垫层的实际温度场,将实际温度场与反演的理论温度场进行对比,同时,开展施工期垫层混凝土垫层的温度-应力数值模拟.结果表明:反演所得参数能较好地反映实际浇筑过程中的温度场和应力场.土石料开始填筑之后,不同位置各个方向应力变化开始出现差异,所有土石料填筑完成后,各向应力均趋于稳定.

In order to conduct in-depth research on the temperature field and stress field distribution of the concrete cushion layer in Nuozhadu,based on the temperature monitoring data of the cushion layer,combined with the calculation of reservoir water temperature and the temperature of the dam body bedrock,the actual temperature field of the concrete cushion layer was simulated,and the actual temperature field was compared with the inverted theoretical temperature field.At the same time,numerical simulation of the temperature stress of the cushion layer concrete cushion layer during the construction period was carried out.The results indicate that the inverted parameters can effectively reflect the temperature and stress fields during the actual pouring process.After the start of soil and stone filling,there are differences in stress changes in different positions and directions.After all soil and stone filling is completed,the stress in all directions tends to stabilize.

宋博旭;罗航;苏武华

华能澜沧江水电股份有限公司糯扎渡水电厂,云南 普洱 665005华能澜沧江水电股份有限公司糯扎渡水电厂,云南 普洱 665005华能澜沧江水电股份有限公司糯扎渡水电厂,云南 普洱 665005

建筑与水利

糯扎渡水电站监测数据反演分析数值模拟

Nuozhadu Hydropower Stationmonitoring datainversion analysisnumerical simulation

《云南水力发电》 2026 (5)

173-177,5

10.3969/j.issn.1006-3951.2026.05.042