根据昌马河流域 110 kV 联合变电站运行现状及目前存在的问题,对变电站进行综合自动化更新改造,主要包括将 2 台主变中压侧进线断路器、35 kV 母线断路器及 5 回 35 kV 出线间隔内的六氟化硫断路器更换为真空断路器,35 kV联首线断路器已更换为真空断路器,并进行综合自动化改造.文章对改造方案、改造施工中应注意的问题及注意事项进行详细探讨,为变电站改造工程提供方法参考.

Based on the current operation status and existing problems of the 110 kV joint substation in the Changma River Basin,a comprehensive automation update and renovation of the substation will be carried out.The main content includes replacing the incoming circuit breakers on the medium voltage side of 2 main transformers,the 35 kV busbar circuit breakers,and the SF6 circuit breakers in the 5-circuit 35 kV outgoing line interval with vacuum circuit breakers,replacing the 35 kV connecting line circuit breakers with vacuum circuit breakers,and carrying out comprehensive automation transformation.This paper provides a detailed discussion on the renovation plan,issues to be noted during the renovation construction,and precautions to be taken,providing methodological references for substation renovation projects.

马佶鸿

甘肃省疏勒河流域水资源利用中心,甘肃 玉门 735211

信息技术与安全科学

昌马河联合变电站更新改造存在的问题技术方案

Changma Riverjoint substationrenewal and renovationexisting problemtechnical solution

《云南水力发电》 2026 (5)

113-115,3

10.3969/j.issn.1006-3951.2026.05.025

评论