以黄登水电站库区某滑坡体为例,从测斜仪的钻孔安装、数据采集、资料整编分析、后期改造进行探讨,分析该滑坡体的稳定性,检验测斜仪在滑坡体中的应用效果.结果表明:当前该滑坡体已逐步趋于稳定,滑坡体中部以下滑动面应加强监测;在库岸滑坡体中采用测斜仪测量其深部变形是监测变形的重要手段之一,结合当前人工监测面临的缺点,后期将库区测斜孔进行改造升级,采用柔性测斜仪进行自动化监测是有必要的.
Taking a landslide mass in the Huangdeng Hydropower Station reservoir area as an example,this paper discusses the stability of the landslide mass through the installation of inclinometers in boreholes,data collection,data compilation and analysis,and later transformation,and tests the application effect of inclinometers in landslide mass.The results indicate that the landslide has gradually stabilized,and monitoring of the sliding surface below the middle of the landslide should be strengthened.The use of inclinometers to measure deep deformation in the landslide body of the reservoir bank is one of the important means of monitoring deformation.Considering the current shortcomings of manual monitoring,it is necessary to upgrade the inclinometer holes in the storage area and use flexible inclinometers for automated monitoring in the future.
李浪;字林;李剑寒;余涛;郑帅强
华能澜沧江水电股份有限公司黄登·大华桥电厂,云南 昆明 650206华能澜沧江水电股份有限公司黄登·大华桥电厂,云南 昆明 650206华能澜沧江水电股份有限公司黄登·大华桥电厂,云南 昆明 650206华能澜沧江水电股份有限公司黄登·大华桥电厂,云南 昆明 650206华能澜沧江水电股份有限公司黄登·大华桥电厂,云南 昆明 650206
天文与地球科学
测斜仪滑坡体黄登水电站自动化监测
inclinometerlandslide massHuangdeng Hydropower Stationautomated monitoring