市域铁路车门及站台门对位隔离方案研究OA
Research on Alignment Isolation Schemes of Train Doors and Platform Screen Doors for Suburban Railways
[目的]为提高市域铁路CTCS2+ATO 列控系统中车门与站台门联动控制的安全性,针对现有门联动方案在单扇车门或站台门发生故障时可能引发的安全隐患,进行车门及站台门对位隔离方案研究.[方法]首先回顾城市轨道交通中车门及站台门对位隔离的现状,结合市域铁路 CTCS2+ATO 列控系统架构以及车门与站台门对位隔离的应用场景,分析现有方案的不足.基于此,提出 3 种对位隔离方案,通过实时交互车门和站台门的故障状态实现隔离防护功能.方案一和方案二均利用列控系统进行信息交互与联动控制,其中方案一通过传统的继电器接口传递故障信息;方案二则采用通信接口实现;方案三通过在车辆与站台门系统之间增加无线通信通道直接交互故障状态信息.[结果]从方案的系统架构、信息传输及可用性等方面对比发现,方案一和方案二需要对现有列控系统的功能及接口进行较大修改,且故障分析链路较长.相比之下,方案三在操作灵活性、应急响应能力及故障定位方面展现出明显优势.[结论]市域铁路应优先采用车辆与站台门系统之间的直接通信方式实现车门与站台门的对位隔离,可以有效降低因单个门故障引发的风险,并提高故障处理效率.
[Objective]To improve the safety of the linkage control of train doors and platform screen doors in the CTCS2+ATO train control system for suburban railways,and in view of the potential safety hazards that may arise from the failure of a single train door or platform scree door in the existing door linkage schemes,a study on alignment isolation schemes for train doors and platform screen doors is conducted.[Methods]First,the current status of alignment isolation of train doors and platform screen doors in urban rail transit was reviewed to analyze the limitations of the existing schemes,combined with the architecture of the CTCS2+ATO train control system for suburban railways and the specific application scenarios related to alignment isolation of train doors and platform screen doors.On this basis,three alignment isolation schemes were proposed to achieve isolation protection through real-time interaction of the fault states of train doors and platform screen doors.Both scheme 1 and scheme 2 were based on the train control system for information interaction and linkage control,in which scheme 1 transmitted fault information via a traditional relay interface,while scheme 2 employed a communication interface.Scheme 3 directly transmitted fault status information by introducing a wireless communication channel between the train door and the platform screen door system.[Results]A comparative analysis of the three schemes from the perspectives of system architecture,information transmission,and applicability revealed that schemes 1 and 2 required significant modifications to the functions and interfaces of the existing train control system,and their fault analysis chains were relatively long.In contrast,scheme 3 demonstrated significant advantages in terms of operational flexibility,emergency response capability,and fault location.[Conclusion]The research results show that suburban railways should give priority to the direct communication between the train door and the platform screen door system to realize alignment isolation of train doors and platform screen doors,thereby effectively reducing the safety risks caused by single-door failures and improving the efficiency of fault handling.
杨俐;王佳;胡光祥
上海申铁投资有限公司,上海 200031北京全路通信信号研究设计院集团有限公司,北京 100070||列车自主运行智能控制铁路行业工程研究中心,北京 100070上海申铁投资有限公司,上海 200031
交通工程
市域铁路CTCS2+ATO车门站台门门联动对位隔离
suburban railwayCTCS2+ATOtrain doorplatform screen doordoor linkagealignment isolation
《铁道标准设计》 2026 (6)
192-197,6
国家重点研发计划"轨道交通调度控制一体化与联程运输服务技术"项目(2022YFB4300500)上海申铁投资有限公司科研课题(SHST-2023-JSB-312)
评论