为解决小净距叠行隧道开挖引起的地层和隧道衬砌变形超限与结构损伤等问题,采用数值模拟与工程验证的方法,以苏州轨道交通8号线上下净距1.6 m的叠行隧道为依托,建立三维有限元模型,比选"同步注浆""地层加固""支撑台车"以及"地层加固+支撑台车"加固方案对地层和隧道变形的控制效果.研究结果表明:单一同步注浆无法满足地层和隧道变形控制要求.地层加固可显著抑制地表沉降(降幅57%)和下行隧道上浮(降幅63%);支撑台车加固降低下行隧道衬砌环向应力21%,新建隧道盾构机临近阶段减缓隧道上浮(降幅为51%);"地层加固+支撑台车"组合加固方案控制效果最优,实现地表沉降9.3 mm,隧道上浮3.3 mm,净空收敛3.6 mm,与工程实测数据高度吻合.研究结论为类似小净距叠行隧道建设安全提供借鉴.

In order to solve the problems of excessive deformation and structural damage of stratum and tunnel lining caused by excavation of small-clearance stacked tunnels,a three-dimensional finite element model was established based on the superimposed tunnel with a net clearance of 1.6 m on Suzhou Rail Transit Line 8 by using numerical simulation and engineering verification.The control effects of"synchronous grouting""stratum reinforcement""support trolley"and"stratum reinforcement+upport trolley"reinforcement schemes on stratum and tunnel deformation were compared and selected.The results show that single synchronous grouting cannot meet the requirements of stratum and tunnel deformation control.The ground reinforcement can significantly inhibit the surface subsidence(reduction 57%)and the floating of the downward tunnel(reduction of 63%).The reinforcement of the supporting trolley reduces the circumferential stress of the lining of the downward tunnel by 21%,and the adjacent stage of the new tunnel shield machine slows down the floating of the tunnel(a decrease of 51%);the combined reinforcement scheme of"stratum reinforcement+support trolley"has the best control effect.The surface settlement is 9.3 mm,the tunnel floating is 3.3 mm,and the clearance convergence is 3.6 mm,which is highly consistent with the measured data of the project.The research conclusions provide a valuable reference for the construction safety of similar small-clearance overlapped tunnels.

雷风行;毛小勇;史培新

苏州大学 轨道交通学院,江苏 苏州 215006苏州城市学院,江苏 苏州 215104苏州大学 轨道交通学院,江苏 苏州 215006

建筑与水利

叠行隧道变形控制同步注浆地层加固支撑台车小净距

stacked tunnelsdeformation controlsynchronous groutingstratum reinforcementsupport trolleysmall-clearance

《辽宁工程技术大学学报(自然科学版)》 2026 (3)

295-302,8

10.11956/j.issn.1008-0562.20250464