南阳市白河第三级橡胶坝重建工程设计OA
Design of Reconstruction Project of the Third Stage Rubber Dam on Baihe River in Nanyang City
为夯实南阳市白河国家城市湿地公园设施建设基础,以水生态景观为主,兼顾游船通航,实施白河第三级橡胶坝拆除重建和河道清淤疏浚工程.工程主要任务为提高河道泄洪能力,提升水生态景观,兼顾通航等综合利用,同时提升白河左右岸交通水平.文章根据工程现状和建设需求,依据计算数据分析阐述了南阳市白河第三级橡胶坝重建工程和供排水系统工程的设计方案.
To lay a solid foundation for the construction of the Bahe River National Urban Wetland Park in Nanyang City,with water ecological landscape as the main consideration and taking into account the navigation of boats,the demolition and rebuilding of the third-stage rubber dam on the Baihe River will be carried out,and the dredging of the river channel will be implemented.The main tasks of the project are to enhance the flood discharge capacity of the river,improve the water ecological landscape,take into account the comprehensive utilization such as navigation and other purposes,and also improve the transportation condition on both banks of the Baihe River.Based on the engineering status and construction requirements,through the analysis of the calculation data,this article analyzes and elaborates on the design schemes for the reconstruction of the third-stage rubber dam on the Baihe Rive and the water supply and drainage system in Nanyang City.
张世文
河南天龙检测有限公司,河南 南阳 473000
建筑与水利
橡胶坝供排水系统橡胶坝坝袋管路布置
rubber damwater supply and drainage systemrubber dam bagpipelines layout
《河南水利与南水北调》 2026 (4)
26-27,2
评论