Crystallization-induced clogging in tunnel drainage systems:Mechanisms,prevention,treatment,and case studiesOA
Crystallization-induced clogging in tunnel drainage systems:Mechanisms,prevention,treatment,and case studies
Chongming Tian;Yueping Tong;Fei Ye;Haibao Zhang;Han Wang;Yaming Zhang;Hao Cui;Xingbo Han
School of Highway,Chang'an University,Xi'an 710064,ChinaSchool of Highway,Chang'an University,Xi'an 710064,ChinaSchool of Highway,Chang'an University,Xi'an 710064,ChinaSchool of Highway,Chang'an University,Xi'an 710064,China||Xi'an Changzhi Suitong Technology Co.,Ltd.,Xi'an 710065,ChinaSchool of Highway,Chang'an University,Xi'an 710064,ChinaSchool of Science,Xi'an University of Posts & Telecommunications,Xi'an 710121,ChinaSchool of Highway,Chang'an University,Xi'an 710064,ChinaSchool of Highway,Chang'an University,Xi'an 710064,China
Tunnel drainage systemsCrystallization blockagePrevention and treatmentDongtianshan tunnel
Tunnel drainage systemsCrystallization blockagePrevention and treatmentDongtianshan tunnel
《交通运输工程学报(英文版)》 2026 (2)
354-373,20
The research was conducted with funding provided by the National Natural Science Foundation for General Project of China(51878060),the Science and Technology Projects of Xizang Autonomous Region,China(XZ202501YD0007),the Xi'an Science and Technology Plan Project(23KGDW0035-2023),and the Shaanxi Provincial Science and Technology Plan Project(2024GX-YBXM-378).
评论