面板坝连接板布置及受力变形分析OA

Layout,Stress,and Deformation Analysis of Connecting Plates in Face-Slab Dams

中文摘要英文摘要

抽蓄电站上库多采取全库盆防渗措施,基础为回填层的上库大坝,其面板和库底防渗体之间的连接处是防渗的薄弱环节,能否设置连接板,以及连接板对周围结构的应力影响和优化设置值得探讨.研究结合某抽蓄电站上库面板堆石坝工程,建立了趾板-连接板-碎石垫层的面板堆石坝有限元分析模型进行研究.结果表明,设置连接板可减小沥青混凝土面板边缘连接处的拉应力,降低库底沥青混凝土面板开裂的可能性;回填土深度增加时,趾板、连接板处沥青面板的位移有所增大,但对其相对沉降及水平向应力影响较小;当采用3块等长连接板布置形式时,各接缝剪切变形最小,为连接板最优布置形式.研究成果可以为类似坝体布置方案提供参考.

The upper reservoir of pumped storage power station mostly adopts the anti-seepage measures of the whole reservoir basin.The connection between the face slab of the upper reservoir dam with backfill layer and the anti-seepage body at the bottom of the reservoir is a weak link of anti-seepage.Whether the connecting plate can be set,and the stress effect of the connecting plate on the surrounding structure and the optimal setting are worth discussing.In this study,the finite element analysis model of the concrete faced rockfill dam with toe slab,connecting slab and gravel cushion is established for the upper reservoir of a pumped storage power station.The results show that the setting of connecting plate can reduce the tensile stress at the edge of the asphalt concrete face plate,and reduce the possibility of cracking of the asphalt concrete face plate at the bottom of the reservoir;With the increase of backfill depth,the displacement of asphalt face slab at toe slab and connecting plate increases,but has little effect on its relative settlement and horizontal stress;When the layout of three equal length connecting plates is adopted,the shear deformation of each joint is the smallest,which is the optimal layout of connecting plates.The study can provide reference for similar dam layout schemes.

陈振晓;沈琪翔

山东省水利勘测设计院有限公司,济南 250013山东省水利勘测设计院有限公司,济南 250013

建筑与水利

面板堆石坝库区回填连接板布置形式

concrete-faced rockfill damreservoir backfillinglayout of connecting plate

《广东水利水电》 2026 (5)

24-29,6