首页|期刊导航|电器与能效管理技术|变电站综自设备改造自动化校验方案研究与设计

变电站综自设备改造自动化校验方案研究与设计OA

Research and Design of Automated Verification Scheme for Substation Integrated Automation Equipment Renovation

中文摘要英文摘要

针对运行超10 a的变电站站控层综自设备改造调试周期长的问题,提出一种自动化校验方案.通过搭建仿真测试环境,利用数据迁移工具与自动对比分析方法,并充分利用现有旧设备,实现改造后新设备工程数据的静态与动态闭环校验,显著提升改造效率与质量,为老站综自设备快速化改造提供有效技术路径.

To solve the problem of long debugging cycles in the renovation of station control layer integrated automation equipment of substations in service for more than 10 years,an automatic verification scheme is proposed.A simulation test environment is built,data migration tools and automatic comparison analysis methods are adopted,and the original old equipment is fully utilized to realize static and dynamic closed-loop verification of engineering data of new replacement equipment.The renovation efficiency and quality are greatly improved,which provides an effective technical support for the rapid reconstruction of integrated automation equipment in aged substations.

张海庭;郭利军;陈哲;田巧红;邵广时;李永照

许继电气股份有限公司,河南许昌 461000许继电气股份有限公司,河南许昌 461000许继电气股份有限公司,河南许昌 461000许继电气股份有限公司,河南许昌 461000许继电气股份有限公司,河南许昌 461000许继电气股份有限公司,河南许昌 461000

信息技术与安全科学

变电站站控层综自系统设备改造自动化校验

substationstation control layerintegrated automation systemequipment reconstructionautomatic verification

《电器与能效管理技术》 2026 (4)

49-56,8

10.16628/j.cnki.2095-8188.2026.04.006