古城水电站1号机组稳定性测试与运行特性分析OA
Stability test and operation characteristics analysis of Unit 1 of Gucheng Hydropower Plant
本文针对古城水电站1号机组检修后的运行稳定性,开展了变转速、变励磁与变负荷系列试验.结果表明:机组在额定工况下整体运行状态良好,主要测点的振动摆度幅值均符合规范要求;转子质量不平衡量在允许范围内;变励磁过程中转子呈现明显的轴心偏移,主要源于定转子不对中引起的固定方向磁拉力,该现象与轴瓦温差异常直接相关;变负荷试验发现机组在 20%~95%负荷区间存在宽幅振动区,频域分析表明振动能量集中于低频涡带分量,而转频振动保持平稳,说明振动主要由涡带激励引发,且上机架垂直振动因结构刚度不足出现超标.建议机组优先维持高负荷运行以避开振动区,并加强轴承摆度与瓦温监测.本研究可为同类型水电机组的稳定性评价与运行优化提供参考.
A series of variable-speed,variable-excitation,and variable-load tests were carried out to analyze the post-maintenance operation stability of Unit 1 of Gucheng Hydropower Plant.The results are as follows:the hydroelectric generator operates in good overall state under rated conditions,and the vibration and runout amplitudes of main measuring points meet the specification requirements;the rotor mass unbalance is within the allowable range;during the variable-excitation process,the rotor exhibits significant shaft center displacement,which is primarily attributable to a fixed-direction magnetic pull force caused by misalignment between the stator and the rotor,a phenomenon directly associated with abnormal temperature differences in the shaft bearings;the variable-load test reveals a wide-amplitude vibration zone within the load range of 20%to 95%;frequency-domain analysis shows that the vibration energy is concentrated in low-frequency vortex strip components,while the rotational frequency vibration remains stable,indicating that the vibration is primarily excited by the vortex strip;furthermore,the vertical vibration of the upper frame exceeds the standard limit due to insufficient structural stiffness.It is recommended that the hydroelectric generator be operated at a high load to avoid the vibration zone,and that the monitoring of bearing runout and bearing pad temperature be strengthened.This study can provide a reference for the stability evaluation and operation optimization of similar hydroelectric generators.
李林伟;杜中奎;王曾兰;邓华
杭州国电机械设计研究院有限公司,浙江 杭州 310000四川华电杂谷脑水电开发有限责任公司,四川 阿坝 624000杭州国电机械设计研究院有限公司,浙江 杭州 310000杭州国电机械设计研究院有限公司,浙江 杭州 310000
能源科技
水轮发电机组变转速变励磁变负荷振摆
hydro-generator setvariable-speedvariable-excitationvariable-loadvibration and runout
《水电站机电技术》 2026 (4)
6-10,52,6