首页|期刊导航|人民长江|径流丰枯变化下南水北调中线受水区供水风险分析

径流丰枯变化下南水北调中线受水区供水风险分析OA

Analysis of water supply risks in water receiving areas of middle route of South-To-North Water Transfer Project under drought-wetness encounters of runoff

中文摘要英文摘要

针对南水北调中线工程水源区和受水区的径流丰枯遭遇变化给受水区带来供水风险的问题,基于1979~2023 年代表水文站点的实测数据,建立了描述南水北调中线工程水源区与受水区径流关系的 Copula 联合概率分布模型,计算径流丰枯遭遇概率;对中线工程水源区可调水量和受水区水资源量进行调度模拟,得出不同遭遇组合下受水区的可供水量,并基于水量调度模拟结果计算了受水区的供水风险率、回弹性、脆弱性指标,定量分析受水区的供水风险.结果表明:Gumbel-Hougaard Copula 函数在拟合南水北调中线工程水源区与受水区径流之间的联合分布时效果最优,计算得到径流丰枯同步的概率为 41.03%,其中水源区和受水区丰枯遭遇情况为枯-枯、枯-特枯、特枯-枯和特枯-特枯时,遭遇概率分别为 13.53%,2.36%,2.36%,0.61%;中线工程调水量平均占受水区河南省、河北省、天津市和北京市可供水量的 19.18%,27.77%,27.82%,24.65%;水源区和受水区径流频率增加,受水区供水风险呈现上升趋势,当丰枯遭遇情况为特枯-特枯时,受水区供水风险均处于中等风险水平,当遭遇连续枯水年时受水区供水风险还将进一步上升.研究结果可为保障南水北调中线工程正常运行和水资源优化配置提供参考.

This study addressed the water supply risks in the receiving areas of the middle route of the South-to-North Water Transfer Project,which arose from varying drought-wetness encounters of runoff between the water supplying and receiving areas.A Copula-based joint probability distribution model was developed using measured data from representative hydrological stations from 1979 to 2023.The model was used to estimate the probabilities of different runoff encounter conditions.The water availability of the receiving areas was determined through the water dispatching of Danjiangkou Reservoir in the water supplying areas and wa-ter allocation in the receiving areas.The resulting water availability was applied to water supply risk assessment.Based on the re-sults of water availability,the water supply risk rate,resilience,and vulnerability were calculated to quantitatively assess the water supply risks in the receiving areas.The results showed that the Gumbel-Hougaard Copula function best fitted the joint distribu-tion of runoff between the supplying and receiving areas.The synchronous encounter probability of runoff in the water supplying and receiving areas was 41.03%.The encounter probabilities for the dry-dry,dry-extreme dry,extreme dry-dry,and extreme dry-extreme dry conditions were 13.53%,2.36%,2.36%,and 0.61%,respectively.On average,the transferred water accoun-ted for 19.18%,27.77%,27.82%,and 24.65%of the water availability in Henan Province,Hebei Province,Tianjin City,and Beijing City,respectively.The water supply risks in the receiving areas exhibited an upward trend with the decrease in runoff in the water supplying and receiving areas.When both areas experienced extremely dry years,the water supply risk was at a medium level,and it would further increase during consecutive dry years.The research results can provide reference for ensuring the nor-mal operation of the middle route of the South-to-North Water Transfer Project and the optimal allocation of water resources.

张灿;付湘;王永强;郑小康

武汉大学 水资源工程与调度全国重点实验室,湖北 武汉 430072武汉大学 水资源工程与调度全国重点实验室,湖北 武汉 430072长江科学院 水资源综合利用研究所,湖北 武汉 430010黄河勘测规划设计研究院有限公司,河南 郑州 450003

建筑与水利

南水北调中线工程受水区供水风险径流Copula丰枯遭遇

middle route of the South-to-North Water Transfer Projectwater receiving areawater supply riskrunoffCopuladrought and wetness encounter

《人民长江》 2026 (4)

109-116,8

国家重点研发计划重点专项项目(2022YFC3202300)国家自然科学基金项目(52479023)

10.16232/j.cnki.1001-4179.2026.04.013

评论